Safety Information; Installation Sequence And Checklist; Unpacking And Inspecting The Server Blade; Verify Site Preparation - HP Integrity BL860c i2 Installation Manual

Server blade
Hide thumbs Also See for Integrity BL860c i2:
Table of Contents

Advertisement

Safety information

WARNING!
ESD wrist straps include:
The wrist strap that is included in the ESD kit with circuit checker (part number 9300-1609).
The wrist strap that is included in the ESD kit without circuit checker (part number 9300-1608).
The throw away strap that ships with HP memory products.
When removing and replacing server components, use care to prevent injury and equipment
damage. Many assemblies are sensitive to damage by electrostatic discharge.
Follow the safety precautions listed to ensure safe handling of components, to prevent injury,
and to prevent damage to the server blade:
When removing or installing a server blade or server blade component, review the
instructions provided in this guide.
Do not wear loose clothing that might snag or catch on the server or on other items.
Do not wear clothing subject to static charge build-up, such as wool or synthetic materials.
If installing an internal assembly, wear an antistatic wrist strap, and use a grounding mat
such as those included in the Electrically Conductive Field Service Grounding Kit.
Handle components by the edges only. Do not touch any metal-edge connectors or electrical
components on accessory boards.

Installation sequence and checklist

Step
Description
1
Unpack and inspect the server shipping container and then inventory the contents using
the packing slip.
2
Install additional components shipped with the server.
3
Install and power on the server blade.
4
Configure iLO MP access.
5
Access iLO MP.
6
Access UEFI from iLO MP.
7
Download latest firmware using HP Smart Update Manager
8
Install and boot the OS.

Unpacking and inspecting the server blade

Ensure that you have adequately prepared your environment for your new server, received the
components that you ordered, and verified that the server and its containers are in good condition
after shipment.

Verify site preparation

Verifying site preparation is an essential factor of a successful server blade installation, and
includes the following tasks:
Gather LAN information. Determine the two IP addresses for the iLO 3 MP LAN and the
server blade LAN.
Establish a method to connect to the server blade console. For more information on console
connection methods, see
Wear an ESD wrist strap when handling internal server components. Acceptable
Section : "Using iLO" (page 41)
Completed
for more information.
Safety information
17

Advertisement

Table of Contents
loading

This manual is also suitable for:

Integrity bl890c i2Integrity bl870c i2

Table of Contents