Siemens SINAMICS S120 Equipment Manual page 542

Booksize power units
Hide thumbs Also See for SINAMICS S120:
Table of Contents

Advertisement

Cabinet Design and EMC Booksize
9.7 Cooling
Note
The distance between the blow-out aperture of the air conditioner and the electronic
equipment must be at least 200 mm.
Note
If the components are installed in a sealed cabinet, an internal air cooling system must be
installed to circulate the air and prevent hot spots. It is best to install the fan above the
components to optimize the air flow (suction).
Figure 9-21
542
Examples of cabinet ventilation
Booksize power units
Manual, (GH2), 06/2008, 6SL3097-2AC00-0BP6

Advertisement

Table of Contents
loading

Table of Contents