Figure 8-3 Removing the liquid level detector fasteners
Step 4 Reinstall the water pan cover.
Step 5 Verify the connection of the interconnection terminal of the low liquid level
detector.
Figure 8-4 Connect the interconnection terminal.
Issue 07 (2022-12-15)
Copyright © Huawei Digital Power Technologies Co., Ltd.
8 Removing Transport Protection Materials