Choosing The Installation Site; Mechanical And Electrical Installation - AEG AS-BBH1-10000/HV Series Installation Manual

High voltage battery
Table of Contents

Advertisement

Step 2: Pull out the battery pack and stand it upright.
Check if the battery pack is damaged.
Step 3: All the other items are contained in a box in one
corner of the carton. Take them out and check if any
item is missing. Keep the carton for future storage or
transportation.
Battery pack package content
The package content of the AEG battery pack includes
the following items. If any item is missing, please
contact your AEG distributor.
Item
Name
1
Battery pack AS-BBH1-10000/HV
or AS-BBH1-15000/HV (according
to your order)
2
PE wire
3
Allen wrench (M2.5)
4
M4 socket head combination
screws
5
M6 Phillips head three combination
screw
6
M8 expansion screw combination
7
Wall bracket
8
CAN communication wire
9
User manual

4.4 Choosing the installation site

Note: For specific requirements such as the
narrowest maintenance channel, escape route,
etc., please refer to the applicable standards of
the country/ region where the project is located.
Please make sure that the installation location meets
the following requirements:
The installation site should be well ventilated and
sheltered from direct sunlight, rain and snow;
The building is designed to withstand earthquakes
The location should not be in proximity of the sea,
to avoid salt water and humidity.
Ensure there are no corrosive gases at the
installation site, including ammonia and acid vapor.
Ensure there are no flammable or explosive
materials at the installation site or nearby.
AEG HIGH VOLTAGE BATTERY (10 KWH / 15 KWH) INSTALLATION MANUAL
The floor of the installation site must be dry and
flat. Under no circumstance there should be water
on the ground in proximity of the energy storage
system. Ensure that the ground level is levelled
and can fully carry the weight of the high voltage
battery.
The installation site should be clean.
Ensure enough clear space to provide space for
installation, maintenance, and safe escape.
Note: If the ambient temperature is outside of
the operating range, the battery pack will go in
self-protection mode and stop operating. The
optimal temperature range for the battery pack to
operate is between 15°C and 30°C degrees. Frequent
Qty.
exposure to harsh temperatures may deteriorate the
1
performance and lifetime of the battery pack. For this
reason, it is recommended that temperature and
humidity stay at a constant level.
1
The AEG high voltage battery should be installed
1
against a wall.
4
10

4.5 Mechanical and electrical installation

8
Step 1 - Unboxing: Unbox the AEG high voltage
1
battery, put it upright and check for any damage before
proceeding to installation (see 2.2 „Handling safety"
1
and 4.4 „Unboxing").
1
Step 2-Drilling, Fixing: install the AEG high voltage
battery against the wall. Eight holes should be drilled
on the wall in order to fix the racks of the battery
module. Please see below picture for details:
10
EN
PD202209 V2-1-22

Advertisement

Table of Contents
loading

This manual is also suitable for:

As-bbh1-15000/hv series

Table of Contents