C12 Maintenance 2. General Maintenance
2.2 Overhaul (Parts Replacement)
■ If you do not overhaul properly, it may have a serious impact on safety.
■ Overhaul timing is based on an assumption that all joints are operated for equal
distance. If a particular joint has a high duty or high load, it is recommended to
overhaul all joints (as many as possible) before exceeding 20,000 operation hours
CAUTION
with the joint as a basis.
The parts for the Manipulator joints may cause accuracy decline or malfunction due to
deterioration of the Manipulator resulting from long term use.
Manipulator for a long term, it is recommended to overhaul the parts (parts replacement).
The time between overhauls is 20,000 operation hours of the Manipulator as a rough
indication.
However, it may vary depending on usage condition and degree of the load (such as when
operated with the maximum motion speed and maximum acceleration / deceleration in
continuous operation) applied on the Manipulator.
NOTE
For EPSON RC+ 7.0 the recommended replacement time for the parts subject to
maintenance (motors, reduction gear units, and timing belts) can be checked in the
[Maintenance] dialog box of the EPSON RC+ 7.0.
For details, refer to the following manual.
RC700 Series Maintenance Maintenance 6. Alarm
Note:
The recommended replacement time for the maintenance parts is when it reaches the L10
life (time until 10% failure probability). In the [Maintenance] dialog box, the L10 life is
displayed as 100%.
430
In order to use the
C Series Maintenance Manual Rev.2