RRU3203
Installation Guide
Level
Multimeter
2.3 Skills and Requirements for Onsite Personnel
Onsite personnel must be qualified and trained. Before performing any operation, onsite
personnel must be familiar with correct operation methods and safety precautions.
Before the installation, pay attention to the following items:
l
l
Issue 06 (2012-04-16)
The customer's technical engineers must be trained by Huawei and be familiar with the
proper installation and operation methods.
The number of onsite personnel depends on the engineering schedule and installation
environment. Generally, only three to five onsite personnel are necessary.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Torque screwdriver
5 mm
(M3 to M6)
(M3 to M6)
Marker (diameter ≤ 10 mm
[0.39 in.])
2 Installation Preparations
Torque wrench
Capacity: 17 mm [0.67 in.], 21
mm [0.82 in.], and 32 mm
[1.26 in.]
Combination wrench
Capacity: 17 mm [0.67 in.], 21
mm [0.82 in.], and 32 mm
[1.26 in.]
Measuring tape
6