Huawei UPS5000-H User Manual page 141

400 kva-800 kva. 100 kva power modules
Hide thumbs Also See for UPS5000-H:
Table of Contents

Advertisement

UPS5000-H-(400 kVA-800 kVA)
User Manual (100 kVA Power Modules)
Knock the expansion bolt into the hole until the expansion sleeve completely fits
into the hole. The expansion sleeve must be completely buried under the ground
to facilitate subsequent installation.
Figure 6-89 Drilling a hole and installing an expansion sleeve
(1) M12 bolt
(4) Expansion sleeve
Step 3 Remove the UPS cabinet side panels.
Step 4 Remove the front panel from the bottom cabling cabinet.
Step 5 Install anchor baffle plates at the rear of the cabinets.
Figure 6-90 Installing anchor baffle plates at the rear of the cabinets
Step 6 Combine the bottom cabling cabinet.
Issue 03 (2021-08-03)
NO TICE
Copyright © Huawei Technologies Co., Ltd.
(2) Spring washer
(5) Expansion nut
6 Installation
(3) Flat washer
(6) Concrete floor
133

Advertisement

Table of Contents
loading

Table of Contents