SINAMICS S120 Fail-Safe Drives
The use of the safety functions integrated in the drive has been selected
and these can now be activated or deactivated using the operator elements
at the F-CPU.
Only the following messages should be visible
These messages doe not influence the functionality described above.
6.7
Acceptance test
To verify the safety-related parameters, when commissioning the machine
for the first time and also when making changes to the safety-relevant pa-
rameters, an acceptance test must be carried-out. It is imperative that the
acceptance test must be correspondingly logged and documented. The ac-
ceptance reports should be appropriately stored and archived.
The acceptance test must be performed after parameterization has been
completed and power-on reset.
Information about the acceptance test, the acceptance report and an ex-
ample of corresponding acceptance report are provided in the "Function
Manual SINAMICS S120 Safety Integrated" (FHS) in the chapter, Accep-
tance test and acceptance report.
7
History
Table 7-1 History
Version
V1.0
V1.1
I DT Safety Integrated
Date
14.02.2008
First edition
22.01.2009
Second edition
Page 43/43
Entry ID: 28424136
Revision
MC-FE-I-005-V11-EN