①
Figure 5-6
Note
The OP 012 and TCU assembly is similar to that for a PCU.
5.3
Mounting on the mounting wall
The clearance at the rear of the PCU/TCU must be at least 10 mm to ensure sufficient
ventilation (see Figure 5-2 Dimension sheet for attaching the PCU to the OP 012 operator
panel front (Page 98)).
For more detailed information, please refer to the relevant PCU sections and in "General
information and networking", Section: "Application planning", Section: "Climatic and
mechanical environmental conditions" → "Cooling".
NOTICE
Impermissible mounting positions can cause malfunctions
Observe the permissible mounting position: Deviating by up to 5º from the vertical.
This value can be further restricted by mounted components (e.g. PCU).
Operator panel front: OP 012
Manual, 09/2016, A5E36371591B
Knurled screw
(C) OP 012 and PCU after assembly
5.3 Mounting on the mounting wall
Installation
101