Figure 3-4 Power Equipment (Ac/Dc) - Huawei DBS3900 Installation Manual

Indoor centralized rack (icr) dual-mode base station
Hide thumbs Also See for DBS3900:
Table of Contents

Advertisement

3 Information About the Installation
Figure 3-3 RRU
l Place the foam pad or cardboard under the RRU to prevent any damage to the housing of the
l The load-bearing capacity of the RF ports at the bottom of the RRU is low. Do not stand the

Figure 3-4 Power equipment (AC/DC)

3-4
WARNING
RRU.
RRU upright.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
DBS3900(ICR)
Installation Guide
Issue 01 (2011-03-30)

Advertisement

Table of Contents
loading

Table of Contents