SINAMICS Safety Integrated (Booksize)
Commissioning the "SH" and "SBC" functions
5.4
Commissioning the "SH" and "SBC" functions
5.4.1
General information about commissioning safety functions
Commissioning notes
Caution
!
For safety reasons, Safety Integrated must be commissioned using STARTER in
online mode.
Reason:
STARTER should only be used to store the safety parameters of a project
monitoring channel. As a result, downloading a project with active Safety
Integrated results in safety problems.
What to do if you download a project when Safety Integrated is active:
S
Switch to online mode and compare the safety parameters between the two
monitoring channels in safety commissioning mode.
S
Exit safety commissioning mode.
S
Switch the power on.
5-162
E Siemens AG, 2004. All rights reserved
SINAMICS S120 Installation and Start-Up Manual, 12/04 Edition