Sign In
Upload
Manuals
Brands
Siemens Manuals
Medical Equipment
ADVIA 2400
Siemens ADVIA 2400 Manuals
Manuals and User Guides for Siemens ADVIA 2400. We have
2
Siemens ADVIA 2400 manuals available for free PDF download: Operator's Manual, Maintenance Procedures
Siemens ADVIA 2400 Operator's Manual (200 pages)
Chemistry System
Brand:
Siemens
| Category:
Medical Equipment
| Size: 7.44 MB
Table of Contents
Table of Contents
3
1 System Overview
13
Operating Principle
13
Hardware Overview
14
Display and Power Panel
15
Analyzer Back View
15
Analyzer Top View
16
Vertical Pumps
17
Horizontal Pumps
17
Workstation (Front View)
18
PC (Front View)
18
PC (Back View)
19
Sampling and Analysis
19
Sampling Mechanisms
19
Sampling Operation
19
Sample Probe
20
Sample Pump
20
Clot Detection
21
Reaction Tray
21
Reaction Tray Mixers
22
Reaction Tray Wash Mechanisms
22
Reaction Tray Washer Operation
24
Reaction Tank
25
Sample Tray
25
Sample Tray Operation
26
Container Types
26
SMP Pause
26
Spectrophotometer
27
Reagents
27
Reagent Mechanisms
27
Reagent Trays
28
Reagent Probes
29
Reagent Pumps
29
Reagent Tray Operation
30
Reagent Container Types
30
RGT Pause Button
30
Sample Aspiration and Dilution Mechanisms
30
Dilution Tray Mixer
31
Dilution Tray Mixer Operation
31
Dilution Tray Wash Mechanisms
31
Dilution Tray Wash Mechanism Operation
33
ISE (Electrolyte Analyzer)
34
Universal Rack Handler - Functional Description (Optional)
35
Software Overview
36
Startup Window
36
Operation Panel
36
Buttons
37
Status and Message Boxes
37
Other Tasks Accessed from System(S) on the Operation Panel
37
Menu Panel
38
Other Tasks Accessed from System(S) on the Menu Panel
38
Description of Software Windows
40
Request Windows
40
Order Entry Window
40
Sample Log Window
40
Test Result Monitor Window
41
Sample Test Status Color Codes
41
Review/Edit Window
43
Reaction Monitor Window
43
Realtime Monitor Window
43
Print Report Window
44
Test Select Window
44
Cup/Tube Assign Window
44
Test Utilization Statistics Window
44
Correlation Window
45
Calibration Windows
45
View Calibration Curve Window
45
Calibration/Rbl History
45
Sample Select Window
46
Calibration Setup Window
46
Maintenance Windows
46
System Startup/Shutdown Setting Window
46
User Maintenance Window
47
System Monitor Window
47
System Maintenance Monitor Window
47
Lamp Energy Monitor Window
47
ISE Operation Window
47
ISE Monitor Window
48
Manual Operation Window
48
On-Line Monitor Window
48
Error Report Window
49
Reagent Windows
49
Reagent Inventory Window
49
CTT Monitor Window
49
Reagent Container Settings Window
49
Active Test List Window
50
Reagent Information Window
50
Reagent Barcode Maintenance Window
51
QC Windows
51
ADVIA QC Window
51
Real-Time QC Window
52
Daily Precision Control Window
52
QC Cumulative Window
53
Control Data Setup Window
53
Sample Select Window
54
QC Sample Definition Window
54
Setup Windows
54
System Specification Settings Window
54
Analytical Parameters (Chemistry) Window
55
System Test List Window
56
Analytical Parameters (Serum) Window
56
Process Sequence Window
57
Ratio Parameters Window
57
Contamination Settings Window
57
Ctrl/Cal Sample Setup Window
57
User Code Settings Window
58
New Test Definition Window
58
ISE Parameter Settings Window
58
Print Form Settings Window
58
Online Settings Window
59
Alarm Buzzer Settings Window
59
System Parameters Settings Window
60
Reflex Test Settings Window
60
Other Tasks
60
Version Information Window
61
ADVIA O.p
61
Controller
61
Safety Message
61
Etc
62
Memo
62
Using Online Help
62
Viewing the Content
63
2 Operating the System
65
Start the System
65
Logging on
65
Starting the System
65
Performing a System-Assisted Startup (Start Set)
66
Checking the Analyzer
67
Times Required to Perform Prime, Washes, and Cell Blank
71
Daily Operation
72
Using Workorders
72
Using Host Computer Workorders
72
Creating Workorders at the Analyzer
73
Creating Multiple Workorders
73
Deleting or Changing Test Selectivity for Multiple Workorders
74
Creating a Profile
75
Creating a Load List
75
Loading Patient Samples
76
Loading Patient Samples on the STT
76
Loading Patient Samples on the Optional Universal Rack Handler
77
Urgent Samples and Manual Reruns Are Run from the Onboard Sampler (STT)
79
Starting the Run
79
Running Calibrators and Reagent Baselines (RBL)
80
Running Control Samples
80
Running an Interrupt (STAT) Sample
81
Monitoring an Analysis While It Is Running
82
Processing Status
82
Sample Information and System Status
82
Monitoring Samples Loaded on the Optional Universal Rack Handler
83
Using the Sample Log
84
Viewing the Sample Log Entries
84
Searching the Sample Log
84
Deleting a Specific Sample Log Entry
85
Deleting All Sample Log Entries
85
Printing a List of the Sample Log Entries
85
Exporting the Sample Log Entries
86
Reviewing the Calibration Results
86
Reviewing the Sample Results
86
Reporting Results
86
Real-Time Reporting
86
Batch Transmission to a Host Computer
87
Printing Sample Data
87
Batch Printing
88
Shutting down the ADVIA Chemistry System
88
Examples of Shutdown Settings
89
System Available During the Night
89
Automatic Startup from the Sleep State
89
Automatic Startup with Analyzer Power Kept on
89
Performing a System-Assisted Shutdown (Shutdown Set)
90
Additional Operating Instructions
91
Switching Process Sequence and System Test List Numbers
91
Loading the Reagent Trays
91
Updating the Cumulative QC
91
Running Automatic Calibration
92
Using Multiple Reagent Containers for the same Test
92
3 Calibration
93
Calibration Overview
93
When to Calibrate
93
Setting up the Calibration
93
Entering Absolute or Single-Point (STD) Calibration Methods
93
Entering Multi-Standard Calibration Methods
94
How to Calibrate a Multi-Standard Method
95
Running Calibration
95
Reviewing the Calibration
96
4 Quality Control
99
Quality Control Overview
99
When to Run Control Samples
99
Setting up Quality Control
99
Running the Control Samples
99
ADVIA QC Window
100
Reviewing the Control Results at Different Windows
100
5 Maintenance
101
Maintenance Schedule
101
Daily Maintenance
103
Inspecting and Cleaning the Probes
103
Cleaning the Probes Using Automatic Advance Probe Motion
103
Cleaning the Probes Using Manual Probe Motion
104
Probe Cleaning Procedure (Optional Method)
106
Inspecting and Cleaning the Mixing Rods and Mixer Wash Cups
107
Checking Reagents and System Solutions
108
Inspecting and Cleaning the Reaction (WUD) and Dilution (DWUD) Cuvette Washers
108
Inspecting and Cleaning the Cuvette Splash Covers
111
Inspecting and Cleaning the Probe Wash Cups
112
Checking Pumps for Leaks
113
Checking the SP and DIP Vertical Pumps for Leaks
113
Checking Other Vertical Pumps for Leaks
114
Checking the Horizontal Pumps for Leaks
114
Performing the Startup Wash (WASH3)
115
Performing the Shutdown Wash
117
Performing Additional ISE Electrode Washes
118
Recording ISE Slopes
119
Weekly Maintenance
119
Performing the Weekly Wash
119
Checking and Replenishing the Lamp Coolant
121
Checking Lamp Energy
122
Reading Lamp Energy Data
123
Measuring Cuvette Blanks
124
Cell Blank Measurement Results
124
Cleaning the Analyzer and Rack Handler Exterior Panels
125
Monthly Maintenance
126
Cleaning the Turntable Interiors (STT/CTT and RTT)
126
Cleaning the Inside of the STT/CTT Housing
126
Cleaning the Inside of the Reagent Tray Refrigerated Housing
127
Cleaning or Replacing the Wash Solution Reagent Containers (47 - 50)
127
Cuvette Wash and Cuvette Conditioner Usage
128
Cleaning and Replenishing the Dilution Bottle
128
Cleaning and Replenishing the Cuvette Wash Bottle
129
Cleaning the Chiller Filter
130
Every 2 Months Maintenance
131
Cleaning the Dilution Tray Cuvettes
131
Cleaning and Replenishing the Cuvette Conditioner Bottle
132
Every 3 Months Maintenance
133
Replacing the Lamp
133
Washing the ISE Electrodes Lines
135
Every 4 Months Maintenance
137
Cleaning the Ancillary Reagent Bottle Filters
137
Cleaning the Pure-Water Bottle Filter
137
Replacing the Reaction and Dilution Cuvettes
140
As Required Maintenance
143
Backing up System Files
143
Restoring System Files
144
Replacing the SPP, RPP1, and RPP2 Probes
144
Remove the Probe
145
Install a New Probe
146
Replacing DPP Probes Equipped with Crash Detection
147
Removing the DPP Probe
147
Install the New Probe
149
Priming the System
150
Replenishing the RRV (Reaction) Bath Oil Bottle
150
Preventive Cleaning of the Wash Station Lines
151
Washing All the ISE Lines
155
Washing the Lines
156
Rinsing the Lines
156
Priming and Initializing the ISE Module
157
Conditioning the ISE Na and K Electrodes
157
Replacing ISE Electrodes
158
Removing Electrodes
159
Installing Electrodes
159
Priming the Ises
159
Calibrating the Ises
160
Storing the Reference Electrode
160
Cleaning the Dilution Bowl and Waste-Drain Nozzle
161
Cleaning the Dilution Bowl
161
Cleaning the Waste-Drain Nozzle
162
Maintaining the ISE Unit after the Dilution Bowl and Waste-Drain Nozzle Are Clean
163
Recovering from a Power Failure
163
Preparing the System for an Expected Power Outage
163
Preparing the System for Power Return (if Power was Unexpectedly Lost While System was On)
163
Recovering from an Unexpected Power Outage (after Power Returns, When Power was Unexpectedly Lost While System was On)
164
6 Troubleshooting
166
7 File Management
168
Saving the Error Log to a Test File
168
Capturing the Error Report
168
Saving the Test Data from the User Maintenance Window
169
Saving Test Data
169
Saving Reaction Data in CSV Format
170
Saving a Data Archive from User Maintenance Window
171
Viewing Data that was Previously Archived
172
8 System Setup
174
Calibrating the Touch Screen Monitor
174
Calibrating the Touch Screen
174
Configuring Serum Indices
174
Connecting to Your Host Computer
174
Cup/Tube Assignment
175
Setting up the ISE
176
Activating the ISE
176
Setting up ISE Parameters
176
ISE Calibration
176
Appendix A - Safety Information
178
Warning and Hazard Statements
178
Biohazard Warning
178
Electrical Warning
178
Laser Warning
178
Household Bleach Warning
179
Regulatory Compliance
179
Laser Information
179
Appendix B - Warranty and Support Information
183
Limited Instrument Warranty and Service Delivery Policy
183
Warranty Period
183
Additional Service Period
183
Service Calls
184
Service During Normal Hours
184
Extent of a Service Call
184
Service Outside Normal Hours
184
Replacement of Parts
184
Warranty and Service Exclusions
184
Design Changes and Retrofitting of Instruments
186
OSHA Requirements
186
Software License
186
ADVIA Contact Information
187
Siemens Worldwide
187
Appendix C -Customer Replaceable Parts
188
Appendix D - Specifications
190
Specifications - All
190
Appendix E - Symbols
194
Explanations of Symbols Associated with the ADVIA 2400 System
194
Warning and Caution Symbols
194
System Operation Symbols
195
System Rating Label Symbols
196
Hardware Component Symbols
197
Ancillary Reagent Symbols
197
Connector Symbols
198
System Packaging Label Symbols
198
Advertisement
Siemens ADVIA 2400 Maintenance Procedures (69 pages)
Chemistry System
Brand:
Siemens
| Category:
Laboratory Equipment
| Size: 1.67 MB
Table of Contents
Maintenance
5
Daily Maintenance
6
Cleaning the Probes Using Manual Probe Motion
7
Probe Cleaning Procedure (Optional Method)
8
Inspecting and Cleaning the Mixing Rods and Mixer Wash Cups
9
Checking Reagents and System Solutions
10
Inspecting and Cleaning the Cuvette Splash Covers
13
Inspecting and Cleaning the Probe Wash Cups
14
Checking Pumps for Leaks
15
Checking Other Vertical Pumps for Leaks
16
Performing the Startup Wash (WASH3)
17
Performing the Shutdown Wash
19
Performing Additional ISE Electrode Washes
20
Weekly Maintenance
21
Checking and Replenishing the Lamp Coolant
22
Checking Lamp Energy
23
Reading Lamp Energy Data
25
Cleaning the Analyzer and Rack Handler Exterior Panels
27
Monthly Maintenance
28
Cleaning the Inside of the Reagent Tray Refrigerated Housing
29
Cuvette Wash and Cuvette Conditioner Usage
30
Cleaning and Replenishing the Cuvette Wash Bottle
31
Cleaning the Chiller Filter
33
Every 2 Months Maintenance
34
Cleaning and Replenishing the Cuvette Conditioner Bottle
35
Every 3 Months Maintenance
37
Washing the ISE Electrodes Lines
39
Every 4 Months Maintenance
41
Cleaning the Pure-Water Bottle Filter
42
Replacing the Reaction and Dilution Cuvettes
44
As Required Maintenance
47
Restoring System Files
48
Replacing DPP Probes Equipped with Crash Detection
51
Replenishing the RRV (Reaction) Bath Oil Bottle
54
Preventive Cleaning of the Wash Station Lines
55
Washing All the ISE Lines
59
Washing the Lines
60
Conditioning the ISE Na and K Electrodes
61
Replacing ISE Electrodes
62
Removing Electrodes
63
Priming the Ises
64
Storing the Reference Electrode
65
Cleaning the Waste-Drain Nozzle
66
Maintaining the ISE Unit after the Dilution Bowl and Waste-Drain Nozzle Are Clean
67
Preparing the System for Power Return (if Power was Unexpectedly Lost While System was On)
68
Advertisement
Related Products
Siemens ADVIA 2120
Siemens ACUSON Freestyle
Siemens ACUSON X300
Siemens ARCADIS Varic
Siemens ACUSON Sequoia
Siemens ACUSON Redwood
Siemens ACUSON Juniper
Siemens ARCOSKOP
Siemens ARCADIS Avantic
Siemens ARCADIS Orbic
Siemens Categories
Industrial Equipment
Controller
Control Unit
Oven
Washer
More Siemens Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL