Vacpan Installation - AEG Oxygen Installation Manual

Table of Contents

Advertisement

8
AEG installation manual
Notes!
Minimize Condensation
If the tubing installation is carried out in winter, a large amount of condensation may be generated. To reduce the amount of condensation, close all pipe holes and inlet open-
ings using duct tape during installation. Before starting to use the central vacuum system for the fi rst time, let the system vacuum and circulate fresh air for a few minutes, and
make sure that there is no water in the dust container. If there is water in the container, drain it and continue vacuuming until no more water is accumulated.
45° elbow
90° sweep T
45° elbow

VacPan Installation

VacPan is most useful in the kitchen, in the hallway, etc. It can be easily installed, for
example, in a cabinet footing or next to the wall.
VacPan dimensions:
7 1/2"
(190 mm)
8 5/8"
(215 mm)
switch
front edge is fl ush
with fl oor surface
central vacuum
low voltage
connections
90° elbow
starts when
switch is
activated
additonal
cover plate is
available
Example showing piping with different types of
connections.
90° sweep T
pipe connector
90° sweep elbow
pipe
90° elbow
Example of a VacPan
installed in a cabinet.
maintenance access
required
90° elbow
cabinet fl oor
fl oor
VacPan
installation using fl exible
vacuum tube
90° sweep
elbow
90° elbow
90° sweep elbow
45° single Y
piping may exit
the cabinet and go
vertical

Advertisement

Table of Contents
loading

Table of Contents