Read these instructions completely and carefully. This appliance must be properly grounded. See “Grounding the Appliance.” IMPORTANT • Save these instructions For Monogram local service in your area, for local inspector’s use. 1.800.444.1845. IMPORTANT • Observe all governing For Monogram Service in Canada, codes and ordinances.
The warming drawers may be installed directly into a wall or wall oven cabinetry, or below ZTD910 a countertop. 27” Wide Model: ZKD910 FRONT PANEL ACCESSORIES ZXD27B, ZXD30B: ZXD30P: This kit provides for the installation of a custom This kit provides for the installation of a stainless front panel on 27”...
22” 26” 30” ZTD910 w/ZXD30P 23-1/4” 27-1/2” 30” ZKD910 22”26” 26-3/4” ADVANCE PLANNING • Electrical power cord is located on the right side of the • The drawer may be installed below a countertop, a warming oven. Locate the outlet within reach of the 56”...
Design Information GROUNDING THE APPLIANCE Please read carefully. FOR PERSONAL SAFETY, THIS APPLIANCE MUST BE PROPERLY GROUNDED. Do not use an extension cord or adapter plug with this appliance. Follow National electrical codes or prevailing local codes and ordinances. Recessed Receptacle This warming drawer must be supplied with 120V, 60Hz, 7”...
Installation Preparation TOOLS REQUIRED MATERIALS REQUIRED (provided) 4 Wood Screws Safety Glasses Hand Saw MATERIALS REQUIRED (not provided) Drill and Measuring Tape 1/16” Bit 2x2 or 2x4 Level 2x2 or 2x4 Lumber for Phillips Screwdriver Wood Block Runners for Anti-Tip Security Adhesive or other hardware for installing runners or shelf to support warmer drawer...
28-1/2” 30” above the Warming Drawer location does not obstruct above the Warming Drawer location does not obstruct ZKD910 25-1/2” 26-3/4” the required interior 23-1/2” depth and 9-1/4” height. the required interior 23-1/2” depth and 9-1/4” height. When installed under a wall oven: The rough opening for the drawer must be: –...
Solid Barrier Dimensions 1/4” ZTD910 28-1/2” ZKD910 25-1/2” 23-1/2” Min. *NOTE: When installing the warming drawer below a cooktop, a solid barrier must be installed at least 1” from the lowest point of the bottom of cooktop Install a Solid Barrier burner box to the top of cutout.
Installation PROVIDE CABINET SUPPORT 2”x4” or 2”x4” or Equivalent Runners Equivalent Runners 23-1/2” 23-1/2” 22” 25” 27” 30” • The support must be level and rigidly mounted, flush with IMPORTANT: When installed below a single or double oven, check to be sure that any oven supports above the cutout do not obstruct the 23-1/2”...
WARMING DRAWER CUSTOM Installation PANEL ACCESSORY KIT ZXD27B AND ZXD30B Instructions For installation of 27” and 30” wide warming drawer custom panel and custom handle. BEFORE YOU BEGIN STEP 1 PREPARE DRAWER Read these instructions completely and carefully. FOR PANEL INSTALLATION IMPORTANT •...
Page 11
Installation STEP 6 INSTALL LAMP JEWEL STEP 4 SECURE CUSTOM PANEL TO METAL MOUNTING PANEL Turn the assembly appearance side up. • Use plastic to wood adhesive to secure the lamp jewel • Lay the custom panel, appearance side down, on a to the front of the wood panel.
Installation PROFESSIONAL STYLE PANEL ACCESSORY KIT Instructions ZXD30P BEFORE YOU BEGIN STEP 2 REMOVE ORIGINAL Read these instructions completely and carefully. DRAWER FRONT IMPORTANT • Remove the three screws from the bottom of the Save these instructions for • – local inspector’s use.
NOTE: While performing installations described in this book, safety glasses or goggles should be worn. For Monogram local service in your area, ® call 1.800.444.1845. NOTE: Product improvement is a continuing endeavor at General Electric. Therefore, materials, appearance and specifications are subject to change without notice.