r
The equipment can be removed using the following procedure.
Upper panel ASSY
set
Bottom panel ASSY
Note : Follow the disassembly procedure in the numerical order given.
3-1. UPPER PANEL ASSY
2 Screws (M1.4) pan precision
3
1
3-3. MAIN BOARD
9 Remove solder
Battery case ASSY
3 Screw (M1.4)
SECTION 3
DISASSEMBLY
Main board
Upper panel ASSY
2 Screws (M1.4) pan precision
Main section
4 Switch unit (CN801)
!º
pan precision
6 Flexible (CLV)
board (CN551)
5 Flexible board
(CN501)
9 Remove solder
1 Screw (M1.4x2)
toothed lock
Belt ASSY, Front panel ASSY
Mechanism deck section
3-2. BOTTOM PANEL ASSY
1 Screws (M1.4)
pan precision
Bottom panel ASSY
8
2 Screw
7 Screw tapping (M1.7)
– 4 –
Optical pick-up block ASSY
2
1 Screws (M1.4) pan precision
9 Remove solder
Main board
1 Screws (M1.4x2)
toothed lock
Main section