Download Print this page

Hardware System Installation - Casio QT-7300 Series User Manual

Touch screen point of sale terminal
Hide thumbs Also See for QT-7300 Series:

Advertisement

3. Hardware system installation

Unpacking
The QT-7300 along with its accessories are packed in carton box. Make sure that all of the items listed in previous
page are present. After unpacking the carton, place the system on a raised surface and carefully inspect the
system for any damage that might have occurred during shipment. If there are damaged or missing parts, contact
your dealer immediately.
Hardware system installation procedure:
1. Attach large back metal fixture(s) to metal part of the main prop on both side with screws. Please refer
following figure 3.1 to attach metal fixture with correct direction.
2. Attach metal fixture and main prop to the system main body with screws.
3. Attach large hinge cap(s) to the metal fixture(s) with screws.
NOTES:
1. The QT-7300 do not equip any operating system. An operating system must be loaded first before installing
any software into the QT-7300.
2. Be sure to ground yourself to keep from any static charge when you install the internal components. Use a
grounding wrist strap and place all electronic components in any static-shielded devices. Most electronic
components are sensitive to the static electric charge.
3. Disconnect the power cord from the QT-7300 before any installation. Make sure both the system and the
external devices are turned off and the QT-7300 is properly grounded. The sudden surge of power could ruin
any sensitive components.
4. The brightness of the LCD panel display will decrease with use. However, hours of use will vary depending
on the application environment.
5. Avoid using sharp objects to operate the touch-screen. Scratches on the touch-screen may cause
malfunction or non-function to the touch-screen. Also, do NOT press the touch-screen strongly.
QT-7300 User's Manual
1 System main body
2 LCD Display Contrast adjustment
1
3 Large back metal fixtures
4 Cable management shroud
2
5 Large hinge caps
6 Main prop
3
7 Rubber Slip
4
3 Large back metal fixture
System
main
5
body
Main
6
prop
7
Large hinge
cap
Right or Left
side of main
prop
Fig 3.1
5
www.cashregisters.net

Advertisement

loading