About Removal; 5.3.Nic Hot Plugging; 5.3.1.Hot Plugging A Nic Incorporated Into Teaming - Fujitsu PRIMEQUEST 1000 Series User Manual

Serverview mission critical option
Hide thumbs Also See for PRIMEQUEST 1000 Series:
Table of Contents

Advertisement

SVmco User Guidel
5.2.3.About removal
Note
Windows does not support PCI card removal while OS running.
5.3.NIC Hot Plugging
For NIC hot plugging (replacement), you need to especially consider other
matters in addition to the procedure described in
5.2 PCI Card Hot Plugging
Common
Procedure.
This section describes NIC hot plugging combined with teaming.
For details on the fjpciswap command, see
3.6 PCI Card Operation Command
(fjpciswap).
5.3.1.Hot plugging a NIC incorporated into
teaming
This section describes the hot plugging procedure for a NIC incorporated into
teaming.
164

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents