Huawei UPS2000-G User Manual page 39

Lead-acid battery
Hide thumbs Also See for UPS2000-G:
Table of Contents

Advertisement

UPS2000-G-(6 kVA–20 kVA)
User Manual (Lead-Acid Battery)
Optional
Model
Component
Magnetic
DN85H, H38x22x15 (DMEGC)
loop
E2F, 38x22x15 (FENGYI)
Figure 2-7 Installing magnetic rings for the BATT.TEMP, MBS, and EPO ports
Issue 23 (2024-03-15)
NO TE
● It is recommended that you install the battery temperature sensor (secured with an
adhesive) on the surface of batteries in the middle of the battery rack.
● Check the upstream input power cable connection. If the PE wire and neutral wire are
short-circuited, the system is a TN-C system. If the PE wire and neutral wire are
connected separately, the system is a TN-S system.
Copyright © Huawei Digital Power Technologies Co., Ltd.
Function
Optimizes the
performance of the TN-C
power distribution system
in a parallel system.
2 Product Overview
Remarks
In a parallel
system of 15
kVA/20 kVA UPSs
using the TN-C
power distribution
system, install four
magnetic rings at
each PE cable on
each UPS, bind the
four magnetic
rings together
using binding tape,
and secure them
to the nearest
place.
31