D-Link DGS-3130 Series Hardware Installation Manual page 34

Layer 3 stackable managed switch
Hide thumbs Also See for DGS-3130 Series:
Table of Contents

Advertisement

DGS-3130 Series Layer 3 Stackable Managed Switch Hardware Installation Guide
Figure 3-5 Insert Tie Wrap into the Switch
2. Plug the AC power cord into the power socket of the Switch.
Figure 3-6 Connect the power cord to the Switch
3. Slide the retainer through the tie wrap until the end of the cord.
Figure 3-7 Slide the Retainer through the Tie Wrap
4. Circle the tie of the retainer around the power cord and into the locker of the retainer.
34

Advertisement

Table of Contents
loading

Table of Contents