Advertisement

Quick Links

 
 
User Manual
 
BRE‐I‐5K 
OLIPOWER ENERGY &AUTOMATION TECHNOLOGY 

Advertisement

Table of Contents
loading

Summary of Contents for OLiPower BRE-I-5K

  • Page 1   User Manual   BRE‐I‐5K  OLIPOWER ENERGY &AUTOMATION TECHNOLOGY  1   ...
  • Page 2: Table Of Contents

      Contents 1. About This Manual ........................5   1.1   Applicability ................................5   1.2   Target group ................................5   1.3   Symbols used ................................5   2. Safety ..............................6   2.1   General Safety ................................. 6   2.2  ...
  • Page 3   6. Operation Method ........................32 6.1   Control panel ................................. 32   6.2   LCD function ................................32   6.3   LCD operation ............................... 35   6.3.1   Main screen ................................35   6.3.2   Status ..................................35   6.3.3  ...
  • Page 4   Notice This manual contains important safety instructions that must be followed during installation and  maintenance of   the equipment   Save the manual! This manual must be stored carefully and be always available.    4   ...
  • Page 5: About This Manual

      1. About This Manual 1.1 Applicability Please read the product manual carefully before installation, operation, or mai n tenance. This manual contains important safety instructions and installation instructions that must be followed during installation and maintenance of the equipment.  1.2 Target group This manual is intended for qualified electrical personal who are responsible for hybrid inverter installation and commissioning in the storge system.
  • Page 6: Safety

      2. Safety 2.1 General Safety The hybrid inverter has been designed and tested strictly according to international safety regulations. Read all safety instructions carefully prior to any work and always observe them when working on or with the hybrid inverter. Incorrect operation or work may cause: ...
  • Page 7: Explanation Of Symbols

    BRE-I-5K hybrid inverter provide Frequency shift to prevent islanding effect. 2.3 Explanation of symbols This section explains all the symbols shown on the type label.
  • Page 8: Introduction

    3. Introduction 3.1 Basic features The BRE-I-5K hybrid inverters apply to PV energy storage system with PV module, battery, loads and grid. The energy produced by PV system shall be used to optimize self-consumption, excess power charge battery and the rest power could be fed into the grid. Battery shall be discharged to support loads when PV power is insufficient to meet self- consumption.
  • Page 9: Work Modes

      3.2 Work modes The BRE-I-5K Series hybrid inverter has the following work modes based on your configuration and layout conditions Work mode: Self-use Priority: load>battery>grid Generated solar energy Storage in Battery Load consumption Grid supply power Self-consumption of PV renewable energy is the highest priority. The PV excess is used to charge the batteries, then fed back into the grid.
  • Page 10   Generated solar energy Load consumption Feed into grid Charge the battery Work mode: Force time use Priority: battery>load>grid (when charging) Generated solar energy Storage in battery Load consumption Grid supply power when the battery capacity is not enough Priority: load>battery>grid (when discharging) 10 ...
  • Page 11   Generated solar energy Load consumption Self-use from battery Grid supply power when the battery capacity is not enough This mode applies the area that has electricity price between peak and valley. User can use of-peak electricity to charge the battery. The charging and discharging time can be set flexibly, and it also allows choosing whether charge from the grid or not.
  • Page 12: Terminals

    EPS output 3.3 Terminals The BRE-I-5K hybrid inverters apply to PV energy storage system with PV module, battery, loads and grid. The energy produced by PV system shall be used to optimize self-consumption, excess power charge battery and the rest power could be fed into the grid.
  • Page 13: Dimensions

    EPS port Battery connector Energy meter port DC switch 3.4 Dimensions Figure 3-3 Dimension 4. Technical data PV Input Model BRE-I-5K Max.DC Input Power 6500W Max.DC Input Voltage 580V MPPT Voltage Range 100-550V MPPT Range for Full Load 210-500V Start-up Voltage/...
  • Page 14 Nominal Output Frequency 50/60HZ Max. Output Current Output THDi (@Linear Load) <3% Automatic Switch Time <5 S Peak Output Apparent Power 3500W Efficiency Model BRE-I-5K Max. Efficiency 97.60% MPPT Efficiency 99.90% General Data Model BRE-I-5K Size (Width*Height*Depth) 620*720*210mm Weight 135kg...
  • Page 15: Installation

        We recommend that users choose the   two batteries (BRE-B-10K/ BRE-B- NOTICE 14K) with the inverter. If the user   wishes to use a different battery model, please contact the supplier to confirm. 5. Installation 5.1 Unpacking Check the delivery for completeness. Contact your dealer at once if anything is missing Object Quantity...
  • Page 16: Check For Transport Damage

      Meter Expansion tubes & Expansion screws M5 Screw Earth Terminal User Manual & Quick installation guide Quality Certificate Open the package and pick the product, check that if there is any distortion or impaired during the transportation. Meanwhile, check that if the relating accessories and the materials are here, you can see the accessories list in the table.
  • Page 17: Available Space

      If you install the inverter in a cabinet, closet or other small enclosed area, · sufficient air circulation must be provided in order to dissipate the heat generated by the unit. Available space Figure 5-1 Inverter space size Preparation Category Tools and Instruments Hammer drill (with a Ф10...
  • Page 18   Diagonal pliers Wire stripper Torque screwdriver (head: M4 or M6; torque range: 0–5 N•m) Installation Rubber mallet Utility knife Cable cutter Crimping tool (model: Open-end wrench (model: Cable tie H4TC0001; manufacturer: H4TW0001; manufacturer: Amphenol) Amphenol) Vacuum cleaner Multimeter (DC voltage Marker measurement range ≥...
  • Page 19: Installation Steps

      If the unit is not balanced apply ballast, any protruding parts should not be · supported by hand. The inverter should be installed so that the operating panel shall be easily · accessible- easy access to the electrical power connection point. Accessible for maintenance and repair work.
  • Page 20: Electrical Wiring Connection

    4 grooves on the bracket Figure 5-3 Step 3: After confirming that the BRE-I-5K is fixed, fix the side panels. 5.7 Electrical Wiring Connection The overview of the connection terminals of inverter please refer to Figure 3-2, and the wiring connections please refer to Figure 3-1 the PV energy storage system wiring diagram in chapter 3.1.
  • Page 21   Internal circuit Figure 5-4 External circuit Note: This diagram is an example for grid system without special requirement on 21   ...
  • Page 22: Pv Wiring Connection

    Communication connection · 5.7.1 PV Wiring Connection Before connecting PV strings to BRE-I-5K hybrid inverter, please make sure requirements are followed as below: The total short- circuit current of PV string must not exceed inverter's max DC · current. Make sure open circuit voltage of PV string is less than 600V.
  • Page 23: Battery Connection

        1. PV switch needs to be installed outside the inverter; 2. PV switch belongs to the accessories of the inverter, please look NOTICE  for it in the accessories; Connection Steps: Disconnect the PV switch. · Remove the back cover of the PV waterproof switch box ·...
  • Page 24   Step 1 Battery Communication Connection   WARNING!      Make sure you select the correct specification cables for installation. Otherwise, the power will make the cable hot or burnt; it could result in death or serious injury The communication interface between battery and inverter is CAN with a Rj45 connector, The Pins definition is as below CANH CANL...
  • Page 25: Ac Output Connection

    Figure 5-7 5.7.3 AC Output Connection BRE-I-5K inverters have already integrated RCMU (residual current monitoring unit) inside, however if an external RCD is required, a type A RCD with rated residual current of 30mA or higher is recommended. There are two AC terminals and the assembly steps for both are the same, us need to check one for 'Grid' another for 'EPS.
  • Page 26     WARNING!      Make sure you select the correct specification cables for installation. Otherwise, the power will make the cable hot or burnt: it could result in death or serious injury. Don't connect the phase to 'PE' terminal, otherwise the hybrid inverter will not function properly.
  • Page 27: Earth Connection

      Figure 5-9 EPS cable installation 5.7.4 Earth connection You can additionally earth the inverter enclosure of a second earthling or equipotential bonding is required locally. This prevents touch current if the original protective conductor fails. Cable size:12AWG Connection step: Strip the earthling cable insulation.
  • Page 28   1. ADD Interface ADD interface PINS definition: 28   ...
  • Page 29   Function METER-485A METER-485B GENA GENB SHUTOWN Temp Meter communication: METER_485A&METER_485B--pin1& pin2. Relay contact output for generator: GENA & GENB--pin3 & pin4. Shut down the hybrid inverter: +5V & SHUTDOWN--pin5& pin6. Temperature of Lead-acid battery Temp & GND--pin7 and pin8. 2.
  • Page 30: Inverter Manipulation

      3. DRED This application meets the requirements of local Australian grid code (AS/NZS 4777.2) which, among specific requirements for connection. calls for compatibility with Demand Response Enabling Devices (DRED), The DRED is under control of a local network operator and allows to put the inverter in one of the Demand Response Modes (DRMs) defined by the standard: DRM 0 Operate the disconnection device ·...
  • Page 31   communication address as page 42: Set the EPS as page 36:   NOTE!      Please set the inverter if it is the first time to start up. Above steps is for the regular start-up of the inverter, lf it is the first time to start up the inverter you need to start up the inverter Shutdown inverter  ...
  • Page 32: Operation Method

      6. Operation Method 6.1 Control panel   NOTICE!      NOTICE  The first use of the equipment requires parameter settings by the engineering staff. The debugging tools (Control Panel) are carried by the engineering staff. Non-professionals are not allowed to use. Object Name Description...
  • Page 33   33   ...
  • Page 34   34   ...
  • Page 35: Lcd Operation

      6.3 LCD operation 6.3.1 Main screen The main screen as below. Press up or down for more information. 6.3.2 Status Press 'OK' to enter the menu, check grid, solar, battery, EPS, and temperature of the inverter Press up and down to select, press 'ESC to return to the Menu. Solar 35 ...
  • Page 36   This status shows the rea time PY parameters of the system, The input voltage. current and power of each PV input. Press up and down button to review the parameter. Press ESC to return to status. Grid This status shows the real time grid parameters such as voltage, current, output power and frequency.
  • Page 37   This status shows the battery situation of the system, include the battery voltage and current charge and discharge voltage charge and discharge current.'+' means in charging; '- means in discharging. Press up and down button to review the parameter. Press ESC to return to Status.
  • Page 38   HW Protect Fault Inverter over current or battery over current or PY over current detected by hardware Disconnect PV, grid, and battery, then reconnect · Or seek help from us, if not go back to normal state. · Grid Lost Fault Grid is lost System will reconnect if the utility is back to normal ·...
  • Page 39   DCV OVP Fault DC component is out of limit in output voltage. Disconnect PV, grid, and battery, then reconnect · Or seek help from us, if not go back to normal state · SW OCP Fault Output current high detected by software Disconnect PV, grid, and battery, then reconnect ·...
  • Page 40   PV Cnf Fault PV Connection Setting Fault Resetting the PV connection · Or seek help from us, if cannot go back to normal state. · Bat Low Fault The battery power is low. Wait the battery to be recharged ·...
  • Page 41: History

      Or seek help from us, if not go back to normal state. · The grid relay always keeps close Grid Relay Fault Disconnect PV, grid, and battery, then reconnect. · Or seek help from us, if not go back to normal state. ·...
  • Page 42   b) Date Time Press up or down button to change date and time. Press Ok to confirm. c) Work Mode Press up or down button to select different work modes. Press 'Ok' to confirm. d) PV Connection This function can set the mode of PV input. There are two modes for selection; Comm and Multi.
  • Page 43   e) Communication Address Press up or down button to change address of local and meter. Press 'OK' to confirm. Advanced settings require the original password 0000, Press'0K'to confirm. Advanced settings must be set and viewed only after entering the pass NOTICE  ...
  • Page 44   Safety User can set safety standard according to different countries and local standards. Press up or down button to change the grid code. Press 'OK' to confirm.   For compliance with AS/NZS 4777.2:2020, please select from NOTICE   Australia A/B/C/ or New Zealand. Please contact your local grid operator to select the region according to the grid code list.
  • Page 45   C10/11 Belgium power Grid. UK power Grid. China China power Grid, meet Grid standards “CN-NBT”. VDE0126-FR France power Grid, meet Grid standards “VDE 0126”. EN50549-PL Poland power Grid. Brazil-180s Brazil power Grid, connect/reconnect time 180s VDE0126-DE Germany power Grid, meet Grid standards “VDE 0126”. CEI0-16 Italy power Grid, meet Grid standards “CEI 0-16”.
  • Page 46   IEC61727-SL Sri Lanka power Grid, meet Grid standards “IEC61727”. Mexico Mexico power Grid, meet Grid standards “IEC61727 60HZ”. New Zealand All systems in New Zealand. Philippines Philippines power Grid, meet Grid standards “IEC61727 60HZ spec”. IEC61727-SL-W Sri Lanka power Grid, Grid voltage range:160-280V, Grid frequency range:47-52HZ.
  • Page 47   Brazil power Grid, meet Grid standards “NBT 16150”. Brazil-W EN50549-PL-W Poland power Grid. Brazil-180s-W Brazil power Grid, meet Grid standards “NBT 16150”. UNE217002-ES Spain power Grid. G98-NI G98 for Northern Ireland G99-NI G99 for Northern Ireland EN50549-NW Norway-400VLine EN50549-NW-LV Norway-230VLine-R3-10-15K-LV only,others reserved IEC61727-LV 133V 50Hz, low voltage power grid...
  • Page 48   h) Export control With this function the inverter can control the energy export to the grid. Press up or down button to change the export power. Press “OK” to confirm Hard export limit control and soft export limit control be set together NOTICE  ...
  • Page 49   Press up or down button to set the parameters of battery. Eps BT Low Rec' means recovery enable switch when battery low capacity in EPS mode, "Eps OL Rec SOC” means EPS overload due to low capacity for battery, if recovered, min soc.
  • Page 50   seconds to confirm. Reset Press up or down button to reset energy, reset errors or factory reset. Press 'OK' to confirm. m) USB Press up or down button to upgrade DSPM, DSPS, ARMC, BATM or BATS. Press 'OK' to confirm. 50 ...
  • Page 51: System Switch

      6.3.5 System Switch Press up or down button to turn on or turn off the inverter, Press “OK” to confirm 51   ...
  • Page 52: About

      6.3.6 About This interface shows the information of the inverter, such as series number and software version 6.4 Advanced settings Advanced parameters of the inverter need to be set using PC tools  Establish communications Please prepare a computer; Connect the communication cable (see mounting accessories) to the computer (USB) and inverter (RS485);...
  • Page 53   the data.  Voltage/Frequent setting After user log into the system >” Remote control” > “Volage/ Frequent” Active power setting  After user log into the system >” Remote control” > “Active power” 53   ...
  • Page 54    Reactive power setting After user log into the system >” Remote control” > “Reactive power” 54   ...
  • Page 55    Volt-watt setting After user log into the system >” Remote control” > “Australia” 55   ...
  • Page 56: Troubleshooting

    7. Troubleshooting This section contains information and procedures for solving possible problems with the BRE-I-5K inverters, and provides you with trouble shooting tips to identify and solve most problems that could occur with the BRE-I-5K series inverters.
  • Page 57: Troubleshooting

      ·Check the warning fault messages in the System Control Panel message is displayed, record it before doing anything further. ·Attempt the solution indicated in below table. 7.1 Troubleshooting Mgr EEPROM Fault The manager eeprom is fault. Disconnect PV, grid, and battery, then reconnect. ·...
  • Page 58 Are the input and output connections and wiring in good condition? · Are the configurations settings correct for your installation? Are the display · panel and the communications cable properly connected and undamaged? Contact OliPower Customer Service for further assistance, please be prepared 58   ...
  • Page 59: Maintenance

      to describe details of your system installation and provide the model and serial number of the unit 7.2 Maintenance Inverters generally do not need any daily or routine maintenance. Heat sink should not be blocked by dust, dirt, or any other items. Before the cleaning, make sure that the DC SWITCH is turned OFF and the circuit breaker between inverter and electrical grid is turned OFF.
  • Page 60: Decommissioning

      around the heat sink for ventilation, check the heatsink for blockage (dust, snow, etc.) and clean them if they exist. Please clean the heat sink with an air blower, a dry & soft cloth, or a soft bristle brush. Do NOT clean the heat sink with water, corrosive chemicals, detergent, etc.
  • Page 61   When the inverter or other related components need to be disposed. Have it carried out according to local waste handling regulations Please be sure to deliver wasted inverters and packing materials to certain site, where can assist relevant department to dispose and recycle. 61 ...
  • Page 62     62   ...

Table of Contents