Pre-Installation Considerations - Sharp KD-HT9JP-G Operation Manual

Heat pump dryer
Table of Contents

Advertisement

Pre-installation considerations

In order to avoid unnecessary fire, electric shock or personal injury hazards, all electri-
cal wiring and grounding must be set in accordance with national electrical standards.
When preparing for installation, ensure that your power supply is:Fuses or circuit
breakers for 220V-240V~, 50Hz, 15A.
To ensure your safety, you must use a three-core socket and ensure that your socket
is properly and reliably grounded.
• Please install on a hard, flat, level floor. (otherwise, abnormal vibration and noise, or
even malfunction, may result.)
• After installing the equipment in the desired position, adjust the horizontal foot of the
dryer if the ground is uneven (do not insert wood chips or any other items under the
foot).
• Avoid direct sunlight and good ventilation.
• Model products with ventilation openings at the bottom should not be placed on floor
materials such as carpets that can block ventilation openings.
• Cotton chips are not allowed to pile up around the drum dryer.
• Please install at 5 ~ 35 °C.
• In an environment where the temperature is too high or too low, the product perfor-
mance may be degraded or damaged.
• Distance between product and wall
Upper end of product : 25mm
Product side : 25mm
Rear of product/wall : 50mm
08

Advertisement

Table of Contents
loading

This manual is also suitable for:

Kd-ht10jp-g

Table of Contents