Download Print this page

Sealey SSCL.1 Manual page 6

Platform scaffold tower

Advertisement

6. ASSEMBLY
Correct assembly should be verified by the appropriately trained person who has been appointed by the company's on-site safety
Delegate.
The checks will cover:
Whether the structure is in good condition.
The completely assembled structure
Verifying whether the mobile tower is correctly assembled and complete.
Verifying whether the mobile tower is vertical or if it needs adjusting.
Verifying that there is no environmental change which may affect the safe use of the mobile tower.
Verifying that the stabilizers and the stabilizer legs comply with the instruction manual.
The brakes (locked wheels)
The cushioning (to compensate for localised defects in flatness)
ALWAYS follow the instruction manual supplied with the product.
These instructions should be available at the site where the mobile access and working tower is being used.
Check that the product, and particularly the safety devices, are in good general condition before each use (part condition and
Geometry). Where parts need to be replaced, only use TUBESCACOMABI components: see manufacturer after-sales service
Sheet https://www.tubescacomabi.com/fr/centre-de-documentation, exploded views, after-sales service section.
© Jack Sealey Limited
Original Language Version
SSCL.1, SSCL.2, SSCL3, SSCL4 Issue:1 (1) 24/04/23

Advertisement

loading

This manual is also suitable for:

Sscl.2Sscl.3Sscl.4