Control Lever (Iso Pattern); Boom Swing Front - Hitachi ZAXIS 70 Operator's Manual

Table of Contents

Advertisement

CONTROL LEVER (ISO PATTERN)

CAUTION: Never place any part of body beyond
window frame. It could be crushed by the boom if
boom control lever is accidentally bumped or
otherwise engaged. If window is missing or bro-
ken, replace immediately.
Prevent possible injury from unexpected ma-
chine movement.
Make sure you know the location and function of
each control before operating.
The machine is equipped with a label showing the control
patterns of the levers and pedals.
IMPORTANT: When digging, avoid hitting tracks with
boom cylinders.
When digging over the end of the tracks,
travel motors should be at the rear to
maximize machine stability and lift ca-
pacity.
When a lever is released, it will automatically return to neu-
tral, and that machine function will stop.
1- Arm Roll-Out
2- Arm Roll-In
3- Swing Right
4- Swing Left
5- Boom Lower
6- Boom Raise
7- Bucket Roll-In.
8- Bucket Roll-Out.

BOOM SWING FRONT

ZAXIS80SB, 80SBLC
Boom Swing Pedal
Pedal (2) is located at the operator's right foot.
Boom Swing Operation
1. Turn cover (1) forward to unlock pedal (2).
2. Push down on the left side of the pedal to move the
boom to the left swing position.
3. Push down on the right side of the pedal to move the
boom to the right swing position.
4. Turn cover (1) backward to lock pedal (2) when the
boom swing operation is no longer required.
OPERATING THE MACHINE
5-2
1
7
4
3
2
1
2
7
8
5
8
6
M1CC-01-010
3
4
M104-05-001
6
5
M104-05-002
1
2
M1CC-13-014

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zaxis 70lcZaxis 80sbZaxis 80sblcZaxis 85us

Table of Contents