Concluding Steps - Fujitsu PRIMERGY CX2550 M2 Upgrade And Maintenance Manual

Table of Contents

Advertisement

Liquid cooling
Figure 95: Power cable routing
Ê Run the power cable of pump as shown.
Figure 96: Installing the second riser module
Ê Install the second riser module (1) as described in chapter
riser module" on page

10.1.2.4 Concluding steps

I
Before powering on the server node connect the tubes to the tube
system of the rack as described in the "RackCDU
"Installing the server node in the server enclosure" on page 50
Ê
I
If the Global LED is flashing with error message "CPU has been
changed" on display after the system is powered on, please follow the
procedure below.
198
43.
Upgrade and Maintenance Manual
"Installing the
TM
Service Manual".
CX2550 M2

Advertisement

Table of Contents
loading

Table of Contents