Special Tools
Figure 5-5: Special Tools
Section 6: Unit Installation
Installation Design for Permanent Ajax Compressor Packages
Foundation
Figure 6-1: Canister Bolt Detail
Preparation of the Foundation and Skid for Grouting
Setting the Engine Compressor
Sheave Alignment Procedure
Figure 6-2: Sheave Alignment Procedure
Grout
Table 6-1: Grout Compressive Strength Requirement Estimates (for reference only)
Final Grouting Instructions
Setting an Inertia-Base AJAX Compressor Unit
Figure 6-3: Typical Concrete-filled AJAX Inertia-base Skid
Figure 6-4: Typical Pit Dimensions for Inertia-base Units
Figure 6-5: Recommended Pit Depth and Sand Pad Specification
Setting Inertia-Base Compressor Unit and Cooler:
Figure 6-6: Recommended Sand Placement following Unit Placement
Fabricated Piping Assembly
Keyless Flywheel Installation and Ignition Timing
Installation
Figure 6-7: Flywheel Cross-Section
Finding TDC and Timing Degree Marks
Setting Timing of the Flywheel
Installation of Sheave and Flywheel
Installation
Table 6-2: Screw Tightening Torques, Sheave and Flywheel
Figure 6-8: Flywheel Tolerances
Removal
Re-Installation
®
AJAX
Table of Contents
41
41
43
43
43
44
44
45
46
46
47
47
47
47
48
49
50
50
51
51
51
51
52
53
54
54
54
55
56
56
56
5

Advertisement

loading

This manual is also suitable for:

Ajax dpc 2804 non-le