Huawei FusionModule1000A20 Commissioning Manual page 48

Prefabricated all-in-one data center
Hide thumbs Also See for FusionModule1000A20:
Table of Contents

Advertisement

FusionModule1000A20 Prefabricated All-in-One
Data Center
Commissioning Guide
System
Fire
Extinguishi
ng System
(CE)
Issue 03 (2022-12-15)
Check
Item
Access
control
system
Extinguish
ant control
panel
Smoke
detector
Heat
detector
Emergency
light
Fire alarm
bell
Extinguish
ant abort
button
Pressure
switch
Electrical
actuator
Horn
strobe
Copyright © Huawei Digital Power Technologies Co., Ltd.
Check
Check Standard
Item
Containe
● The electromagnetic lock indicator is
r door
green when the container door is
closed.
● The electromagnetic lock indicator is
red when the container door is open.
● The container door can be opened
from outside the container using an
access card, and door opening
operations are logged in the
management system.
● The container door can be opened
from inside the container using the
exit button, and door opening
operations are logged in the
management system.
Check
Check indicators on the extinguishant
indicator
control panel.
s on the
● The power indicator turns on.
extinguis
● The alarm indicator turns off.
hant
control
panel.
Check
The indicator blinks once every 6s.
the
indicator.
Check
The indicator blinks once every 6s.
the
indicator.
The
The power indicator turns on.
power
indicator
The
The alarm indicator turns off.
alarm
indicator
on the
extinguis
hant
control
panel
6 Power-On Commissioning
41