2. Preparation for Cabinet Installation

◆ Preparations before installation
① Remove the Box tape at the upper area and then open up the box.
(Fig.2)
② Remove the Top-cushion and bag shielding. Grab the handle inside, take out the cabinet and open Al-Bag.
Then remove the filament-tape and PAD-EPE.
③ Check if the Sliding Bolts are fixed well.
(Fig.3)
Al-Bag
SLIDING BOLT
Open Bag Zipper
Bottom-Cushion
Accessory
Box
LED set
Top-Cushion
Fig. 2 Opening of Box
Fig.3 Check the Bolt
Fig.1 Packing
Component