Download Print this page
Hallowell FORT KNOX Assembly Instructions Manual

Hallowell FORT KNOX Assembly Instructions Manual

Cabinet drawer kit

Advertisement

Quick Links

1. Check material received against the packing list. First, check the number of
packages received and then check the contents of each package.
2. Check the material received for damage. If damage has occurred, secure a
"damage notation" from the carrier
3. Identify each part as it is unpacked and put like parts together as close as possible
to the working area where they are to be assembled.
Be careful to use the correct hardware as specified in the assembly instructions.
4.
In the interest of safety, all lockers must be securely anchored to the floor and/or wall.
For safety, handle all components carefully and wear work gloves when assembling
lockers. Install all units plumb and tighten all hardware securely. Retain instruction for
future reference.
General Instructions
CAUTION
866-566-0500
info@Hallowell-List.com
www.Hallowell-List.com

Advertisement

loading

Summary of Contents for Hallowell FORT KNOX

  • Page 1 In the interest of safety, all lockers must be securely anchored to the floor and/or wall. For safety, handle all components carefully and wear work gloves when assembling lockers. Install all units plumb and tighten all hardware securely. Retain instruction for future reference. 866-566-0500 info@Hallowell-List.com www.Hallowell-List.com...
  • Page 3 (OPTIONAL) FORT KNOX CABINET DRAWER KIT INSTALLATION ITEM DESCRIPTION PART # QTY. FKCDRWW2407 DRAWER 2 (*3) *FKCDRWW2406 SLIDES AC9301-20-LR-A 2 PER FKCSP2412-2L LEFT SUPPORT *FKCSP2415-3L FKCSP2412-2R RIGHT SUPPORT *FKCSP2415-3R 5/16-18 X .75 RND HD CB100 5/16-18 HEX FLANGE NUT N105...
  • Page 4 (OPTIONAL) FORT KNOX CABINET DRAWER KIT INSTALLATION STEP 1 1) Assemble nuts and bolts loosely(6 & 5). 2) Insert nut and bolt to the location where the drawers are going to be located. 3) 3 holes in between top and bottom bolt.
  • Page 5 (OPTIONAL) FORT KNOX CABINET DRAWER KIT INSTALLATION STEP 2 Make sure slides are leveled before installing the drawers. 1) Line up the rivet head on the slides with the holes on the support and insert the slide. Make sure the slide opens towards the front of the unit.
  • Page 6 (OPTIONAL) FORT KNOX CABINET DRAWER KIT INSTALLATION STEP 3 NOTE: USE TWO PEAPLE FOR THE FINAL INSTALLATION OF THE DRAWERS! 1) Open the slides in order to begin installation. 2) Position either of the drawers in between the slides. 3)Insert the two midlle bolts (7) in order to keep the drawer in place.
  • Page 7 (OPTIONAL) FORT KNOX WORKBENCH TOP ATTACHMENT CABINET TOP DRILLING Regardless of the type of Top you will be attaching to the cabinet, remove sufficient top drawers from the cabinet for proper installation. WOOD TOP ATTACHMENT STEEL TOP ATTACHMENT Set Wood Top on the Pedestal Units and align the Drill (2) 9/32"...
  • Page 8 (OPTIONAL) FORT KNOX PEGBOARD INSTALLATION SIDE PEGBOARD WALL PEGBOARD .625 Bolt both Wall Pegboards together usin the (3) holes on the side flanges. Place Pegboards against wall in the location desired. Mark with a pencil the location of the holes where the Pegboards are held.
  • Page 11 CAUTION In the interest of safety, all lockers taller than 36”must be securely anchored to the floor and/or wall for safety . Handle all components carefully and wear work-gloves when assembling units. Install all units plumb and tighten all hardware securely . Retain Instructions for future reference.