Cisco Nexus 9348GC-FXP-B1 Hardware Installation Manual

Cisco Nexus 9348GC-FXP-B1 Hardware Installation Manual

Aci-mode switches
Table of Contents

Advertisement

Quick Links

Cisco Nexus 9348GC-FXP-B1 ACI-Mode Hardware Installation Guide
First Published: 2017-09-27
Last Modified: 2017-12-27
Americas Headquarters
Cisco Systems, Inc.
170 West Tasman Drive
San Jose, CA 95134-1706
USA
http://www.cisco.com
Tel: 408 526-4000
800 553-NETS (6387)
Fax: 408 527-0883

Advertisement

Table of Contents
loading

Summary of Contents for Cisco Nexus 9348GC-FXP-B1

  • Page 1 Cisco Nexus 9348GC-FXP-B1 ACI-Mode Hardware Installation Guide First Published: 2017-09-27 Last Modified: 2017-12-27 Americas Headquarters Cisco Systems, Inc. 170 West Tasman Drive San Jose, CA 95134-1706 http://www.cisco.com Tel: 408 526-4000 800 553-NETS (6387) Fax: 408 527-0883...
  • Page 2 Cisco and the Cisco logo are trademarks or registered trademarks of Cisco and/or its affiliates in the U.S. and other countries. To view a list of Cisco trademarks, go to this URL: https://www.cisco.com/go/trademarks. Third-party trademarks mentioned are the property of their respective owners. The use of the word partner does not imply a partnership relationship between Cisco and any other company.
  • Page 3: Table Of Contents

    Minimizing Electromagnetic and Radio Frequency Interference Shock and Vibration Requirements Grounding Requirements Planning for Power Requirements Airflow Requirements Rack and Cabinet Requirements Clearance Requirements C H A P T E R 3 Installing the Switch Chassis Cisco Nexus 9348GC-FXP-B1 ACI-Mode Hardware Installation Guide...
  • Page 4 Replacing a Power Supply Module Replacing an AC Power Supply Replacing a DC Power Supply Wiring the DC Input Power Source A P P E N D I X A Rack Specifications Overview of Racks Cisco Nexus 9348GC-FXP-B1 ACI-Mode Hardware Installation Guide...
  • Page 5 Rack Mount Kit NXK-ACC-KIT-1RU Rack Mount Kit N3K-C3064-ACC-KIT A P P E N D I X E Site Preparation and Maintenance Records Site Preparation Checklist Contact and Site Information Chassis and Module Information Cisco Nexus 9348GC-FXP-B1 ACI-Mode Hardware Installation Guide...
  • Page 6 Contents Cisco Nexus 9348GC-FXP-B1 ACI-Mode Hardware Installation Guide...
  • Page 7: Preface

    Braces and a vertical bar within square brackets indicate a required choice within an optional element. Indicates a variable for which you supply values, in context where italics variable cannot be used. Cisco Nexus 9348GC-FXP-B1 ACI-Mode Hardware Installation Guide...
  • Page 8: Related Documentation

    Downloadable Documentation • Knowledge Base Articles (KB Articles)are available at the following URL: https://www .cisco.com/c/en/us/support/cloud-systems-management/application-policy-infrastructure-controller-apic/products-configuration-examples-list.html • Cisco Application Centric Infrastructure Controller Release Notes • Cisco Application Centric Infrastructure Fundamentals Guide • Cisco APIC Getting Started Guide • Cisco ACI Virtualization Guide •...
  • Page 9 • Cisco ACI System Messages Reference Guide • Cisco APIC Layer 4 to Layer 7 Services Deployment Guide • Cisco APIC Layer 4 to Layer 7 Device Package Development Guide • Cisco APIC Layer 4 to Layer 7 Device Package Test Guide •...
  • Page 10: Documentation Feedback

    What's New in Cisco Product Documentation, at: https://www.cisco.com/warp/public/687/Directory/DirTAC.shtml. Subscribe to What's New in Cisco Product Documentation, which lists all new and revised Cisco technical documentation as an RSS feed and delivers content directly to your desktop using a reader application. The RSS feeds are a free service.
  • Page 11: Overview

    Overview, on page 1 Overview The Cisco Nexus 9348GC-FXP-B1 switch (N9K-C9348GC-FXP-B1) is a 1-RU fixed-port, L2/L3 switch, designed for ACI deployments. This switch has 48 10/100/1000-Megabit 1GBASE-T host ports that support Power over Ethernet (PoE), 4 1/10-/25-Gigabit SFP28 host ports, and 2 40-/100-Gigabit QSFP28 uplink ports.
  • Page 12 To determine which transceivers, adapters, and cables this switch supports, see the Cisco Transceiver Modules Compatibility Information document. The following figure shows the hardware features seen from the power supply side of the chassis. Cisco Nexus 9348GC-FXP-B1 ACI-Mode Hardware Installation Guide...
  • Page 13 Power supply (2) one used for operations and one used for redundancy, with power supply slot 1 on the left and slot 2 on the right Grounding pad Screw holes (6) for attaching rack mounting brackets USB port Cisco Nexus 9348GC-FXP-B1 ACI-Mode Hardware Installation Guide...
  • Page 14 If the switch has port-side exhaust airflow (blue coloring for fan modules), you must locate the ports in the hot aisle. If you locate the air intake in a hot aisle, the switch can overheat and shut down. Cisco Nexus 9348GC-FXP-B1 ACI-Mode Hardware Installation Guide...
  • Page 15: Preparing The Site

    This switch is rated to operate at altitudes from 0 to 13,123 feet (0 to 4,000 meters) . If you operate this switch at a higher altitude (low pressure), the efficiency of forced and convection cooling is reduced and can result Cisco Nexus 9348GC-FXP-B1 ACI-Mode Hardware Installation Guide...
  • Page 16: Dust And Particulate Requirements

    The wiring is unlikely to emit radio interference if you use a twisted-pair cable with a good distribution of grounding conductors. If you exceed the recommended distances, use a high-quality twisted-pair cable with one ground conductor for each data signal when applicable. Cisco Nexus 9348GC-FXP-B1 ACI-Mode Hardware Installation Guide...
  • Page 17: Shock And Vibration Requirements

    Typically, this switch and a power supply require about 200 W of power input from the power source, but you must provision as much as 443 W power input from the power source to cover peak demand. Cisco Nexus 9348GC-FXP-B1 ACI-Mode Hardware Installation Guide...
  • Page 18: Airflow Requirements

    The switch is positioned with its ports in either the front or the rear of the rack depending on your cabling and maintenance requirements. You must have fan and power supply modules that move the coolant air from the cold aisle to the hot aisle in one of the following ways: Cisco Nexus 9348GC-FXP-B1 ACI-Mode Hardware Installation Guide...
  • Page 19: Rack And Cabinet Requirements

    Work with your cabinet vendors to determine which of their cabinets meet the following requirements or see the Cisco Technical Assistance Center (TAC) for recommendations: • Use a standard 19-inch (48.3-cm), four-post Electronic Industries Alliance (EIA) cabinet or rack with mounting rails that conform to English universal hole spacing per section 1 of the ANSI/EIA-310-D-1992 standard.
  • Page 20: Clearance Requirements

    Width of the front clearance area (equal to the width of the chassis with two rack-mount brackets that are attached to it). Note Both the front and rear of the chassis must be open to both aisles for airflow. Cisco Nexus 9348GC-FXP-B1 ACI-Mode Hardware Installation Guide...
  • Page 21: Safety

    Starting the Switch, on page 26 Safety Before you install, operate, or service the switch, see the Regulatory, Compliance, and Safety Information for the Cisco Nexus 3000 and 9000 Series for important Safety Information. Warning Statement 1071 Warning Definition IMPORTANT SAFETY INSTRUCTIONS This warning symbol means danger.
  • Page 22: Installation Options With Rack-Mount Kits, Racks, And Cabinets

    You can install the switch using the following rack-mount options: • Rack-mount kit (NXK-ACC-KIT-1RU) which you can order from Cisco. This option offers you easy installation, greater stability, increased weight capacity, added accessibility, and improved removability with front and rear removal.
  • Page 23 This product relies on the building's installation for short-circuit (overcurrent) protection. Ensure that the protective devices is rated not greater than 40A for the regular DC power supplies (rated 48-60VDC) and 10A for the HVDC power supplies. Cisco Nexus 9348GC-FXP-B1 ACI-Mode Hardware Installation Guide...
  • Page 24: Unpacking And Inspecting The Switch

    • Burgundy (fan modules and AC power supplies) • Port-side exhaust airflow modules • Blue (fan modules and AC power supplies) Note All power supplies and fan modules must have the same direction of airflow. Cisco Nexus 9348GC-FXP-B1 ACI-Mode Hardware Installation Guide...
  • Page 25: Installing The Switch Using The Nxk-Acc-Kit-1Ru Rack-Mount Kit

    The holes that you use depend on the requirements of your rack and the amount of clearance required for interface cables (3 inches [7.6 mm] minimum) and module handles (1 inch [2.5 mm] minimum). Cisco Nexus 9348GC-FXP-B1 ACI-Mode Hardware Installation Guide...
  • Page 26 (see the following figure). Tighten 12-24 screws to 30 in-lb (3.39 N·m) of torque and tighten 10-32 screws to 20 in-lb (2.26 N·m) of torque. Cisco Nexus 9348GC-FXP-B1 ACI-Mode Hardware Installation Guide...
  • Page 27 Holding the chassis level, insert screws (12-24 or 10-32, depending on the rack type) in each of the two front rack-mount brackets (using a total of six screws) and into the cage nuts or threaded holes in the vertical rack-mounting rails (see the following figure). Cisco Nexus 9348GC-FXP-B1 ACI-Mode Hardware Installation Guide...
  • Page 28: Installingtheswitchusingthen3K-C3064-Acc-Kitrack-Mount Kit

    • Front rack-mount brackets (2) • Rear rack-mount brackets (2) • Slider rails (2) • M4 x 0.7 x 8-mm Phillips countersink screws (12) • The rack is installed and secured to its location. Cisco Nexus 9348GC-FXP-B1 ACI-Mode Hardware Installation Guide...
  • Page 29 Four M4 screws used to attach the bracket to the chassis chassis Rear rack-mount guide aligned to the module end of Two M4 screws used to attach the bracket to the the chassis chassis Cisco Nexus 9348GC-FXP-B1 ACI-Mode Hardware Installation Guide...
  • Page 30 Two customer-supplied 12-24 or 10-32 screws used rack to attach each slider rail to the rack c) Repeat Step 3 to attach the other slider rail to the other side of the rack. Cisco Nexus 9348GC-FXP-B1 ACI-Mode Hardware Installation Guide...
  • Page 31 Holding the chassis level, insert two screws (12-24 or 10-32, depending on the rack type) in each of the two front rack-mount brackets (using a total of four screws) and into the cage nuts or threaded holes in the vertical rack-mounting rails (see the following figure). Cisco Nexus 9348GC-FXP-B1 ACI-Mode Hardware Installation Guide...
  • Page 32: Installing The Switch Into A Two-Post Rack

    To install the switch, you must attach mounting brackets to the switch and secure the switch to the rack. Installation in racks other than 19-inch racks requires a bracket kit not included with the switch. The following figure shows the standard 19-inch mounting brackets. Cisco Nexus 9348GC-FXP-B1 ACI-Mode Hardware Installation Guide...
  • Page 33 Position the bracket so that four of its screw holes are aligned to the screw holes on the side of the chassis as shown in the following figure. Cisco Nexus 9348GC-FXP-B1 ACI-Mode Hardware Installation Guide...
  • Page 34 Repeat previous step for the other front rack-mount bracket on the other side of the switch and be sure to position that bracket the same distance from the front of the switch. Cisco Nexus 9348GC-FXP-B1 ACI-Mode Hardware Installation Guide...
  • Page 35: Grounding The Chassis

    Warning Statement 1046 Installing or Replacing the Unit To reduce risk of electric shock, when installing or replacing the unit, the ground connection must always be made first and disconnected last. Cisco Nexus 9348GC-FXP-B1 ACI-Mode Hardware Installation Guide...
  • Page 36: Starting The Switch

    Before you begin • The switch must be installed and secured to a rack or cabinet. • The switch must be adequately grounded. Cisco Nexus 9348GC-FXP-B1 ACI-Mode Hardware Installation Guide...
  • Page 37 Turn off the circuit breaker for the power source to avoid an electrical shock hazard. b) Verify that the power cable wires from the power source are connected to a connector block. Cisco Nexus 9348GC-FXP-B1 ACI-Mode Hardware Installation Guide...
  • Page 38 A setup utility automatically launches the first time that you access the switch and guides you through the basic configuration. For instructions on how to configure the switch and check module connectivity, see the appropriate Cisco Nexus 9000 Series configuration guide.
  • Page 39: Connecting The Switch To The Aci Fabric

    Note To prevent sub-optimal forwarding between endpoints, connect every leaf switch in the fabric to every spine switch in the same fabric. Cisco Nexus 9348GC-FXP-B1 ACI-Mode Hardware Installation Guide...
  • Page 40: Preparing To Connect To Other Devices

    Cisco equipment. In situations where long parallel cable runs cannot be separated by at least 3.3 feet (1 meter), we recommend that you shield any potential noise sources by housing them in a grounded metallic conduit.
  • Page 41: Connecting Leaf Switches To Apics

    Connecting Leaf Switches to APICs You must downlink one or two (recommended for redundancy) Cisco Nexus 9300 platform ACI-mode leaf switches to each Application Policy Infrastructure Controller (APIC) in your ACI fabric. The type of virtual interface card (VIC) installed on the APIC determines the types of interface cables that you can use to connect the leaf switches to the APICs.
  • Page 42: Connecting Leaf Switches To Spine Switches

    Connect the other end of the interface cable to a downlink port on a leaf switch. • For a Cisco 10GBASE-LR or -SR transceiver and cable, insert the transceiver into a downlink optical port on a leaf switch before connecting the cable to the transceiver.
  • Page 43 • If there are modular switches in the fabric, their ACI-mode line cards must already be installed. The line cards can be of the following types: • 36-port 40-Gigabit (such as: N9K-X9736PQ) • 32-port 100-Gigabit (such as: N9K-X9732C-EX) (supported by Cisco Nexus 9504 and 9508 modular switches) • 36-port 100-Gigabit (such as: N9K-X9736C-FX) Note You cannot include NX-OS line cards in the same chassis when running in ACI mode.
  • Page 44: Second-Generation Switch

    First-generation Cisco Nexus 9000 Series switches include those switches that do not contain an EX or an FX in the PID (product identification). Second-generation Cisco Nexus 9000 Series switches include those switches that have an EX or an FX in the PID.
  • Page 45: Setting Up An Optional Console Interface

    DB-9 connector on the other end of the cable to the serial port on the console device. What to do next You can now perform the initial configuration for the switch (see the Cisco ACI Getting Started Guide). Setting Up an Optional Management Connection You can optionally set up an out-of-band management connection for monitoring and troubleshooting purposes.
  • Page 46: Optic Transceiver Removal Using The Optics Extraction Tool

    (ESD) strap. To ground the strap, attach it directly to earth ground or to a grounded rack or chassis. There must be a metal-to-metal connection to earth ground. Step 1 Remove the fiber-optic cables from the transceiver module before removing the transceiver module. Cisco Nexus 9348GC-FXP-B1 ACI-Mode Hardware Installation Guide...
  • Page 47: Maintaining Transceivers And Optical Cables

    Transceivers and fiber-optic cables must be kept clean and dust free to maintain high signal accuracy and prevent damage to the connectors. Contamination increases attenuation (loss of light) and should be below 0.35 dB. Cisco Nexus 9348GC-FXP-B1 ACI-Mode Hardware Installation Guide...
  • Page 48 • Inspect routinely for dust and damage. If you suspect damage, clean and then inspect fiber ends under a microscope to determine if damage has occurred. Cisco Nexus 9348GC-FXP-B1 ACI-Mode Hardware Installation Guide...
  • Page 49: Replacing Components

    On the fan module that you are removing, press the two sides of the fan module handle next to where it connects to the fan module and pull on the handles enough to unseat it from its connectors. Step 2 Holding the handle, pull the module out of the chassis. Cisco Nexus 9348GC-FXP-B1 ACI-Mode Hardware Installation Guide...
  • Page 50: Installing A Fan Module

    Before you begin • The replacement power supply must have the same wattage and airflow direction as the power supply being replaced. Do not mix AC, DC, HVAC/HVDC power supplies in the same switch. Cisco Nexus 9348GC-FXP-B1 ACI-Mode Hardware Installation Guide...
  • Page 51 Depending on the outlet receptacle on your power distribution unit, you might need the optional jumper cable to connect the switch to your outlet receptacle. e) Verify that the power supply is operational by making sure that the power supply LED is green. Cisco Nexus 9348GC-FXP-B1 ACI-Mode Hardware Installation Guide...
  • Page 52: Replacing A Dc Power Supply

    If the power supply does not fit into the open slot, turn the module over before sliding it carefully into the Note open slot. Cisco Nexus 9348GC-FXP-B1 ACI-Mode Hardware Installation Guide...
  • Page 53: Wiring The Dc Input Power Source

    Figure 2: DC Source A Isolated from Source B with No Common Ground Figure 3: DC Source A and Source B Connections with Common Ground Step 4 Torque all terminal block screws to 11 lbf-in. Step 5 Replace the terminal block safety cover. Cisco Nexus 9348GC-FXP-B1 ACI-Mode Hardware Installation Guide...
  • Page 54 Wiring the DC Input Power Source Step 6 Move the DC poser source circuit-breakers to the ON position. Step 7 Confirm that the poser supply DC OK and PS OK LEDs are green. Cisco Nexus 9348GC-FXP-B1 ACI-Mode Hardware Installation Guide...
  • Page 55: Rack Specifications

    • Standard 19-inch (48.3 cm) (two- or four-post EIA cabinet or rack, with mounting rails that conform to English universal hole spacing per section 1 of ANSI/EIA-310-D-1992). For more information, see Requirements Specific to Perforated Cabinets, on page Cisco Nexus 9348GC-FXP-B1 ACI-Mode Hardware Installation Guide...
  • Page 56: Requirements Specific To Standard Open Racks

    • The roof should be perforated with at least a 20 percent open area. • The cabinet floor should be open or perforated to enhance cooling. The Cisco R Series rack conforms to these requirements. Cable Management Guidelines To help with cable management, you might want to allow additional space in the rack above and below the chassis to make it easier to route all of the fiber optic or copper cables through the rack.
  • Page 57: System Specifications

    Switch Width Depth Height Cisco Nexus 9348GC-FXP 17.3 inches (43.9 cm) With AC power 1.72 inches (4.4 cm) (1 RU) supplies 19.7 inches (49.9 cm). With DC power supplies 21.0 inches (53.34 cm). Cisco Nexus 9348GC-FXP-B1 ACI-Mode Hardware Installation Guide...
  • Page 58: Switch And Module Weights And Quantities

    Switch Typical Power Maximum Power Heat Dissipation Consumption (AC or DC) Consumption (AC or DC) Requirement Cisco Nexus 178 W 287 W 979.284 BTUs per hour 9348GC-FXP Cisco Nexus 9348GC-FXP-B1 ACI-Mode Hardware Installation Guide...
  • Page 59: Power Specifications

    12 VDC Efficiency rating Climate Savers Platinum Efficiency (80Plus Platinum certified) Form factor RSP1 Power Cable Specifications The following sections specify the power cables that you can order and use with this switch. Cisco Nexus 9348GC-FXP-B1 ACI-Mode Hardware Installation Guide...
  • Page 60: Power Cables For Nxa-Pac-1100W Power Supplies

    Japan 250V AC Type A Power Cable CAB-TA-EU Europe AC Type A Power Cable CAB-C15-CBN Cabinet Jumper Power Cord, 250 VAC 13A, C14-C15 Connectors CAB-ACBZ-12A AC Power Cord (Brazil) 12A/125V BR-3-20 plug up to 12A Cisco Nexus 9348GC-FXP-B1 ACI-Mode Hardware Installation Guide...
  • Page 61: Regulatory Standards Compliance Specifications

    Products should comply with CE Markings according to directives 2004/108/EC and 2006/95/EC. Safety • CAN/CSA-C22.2 No. 60950-1 Second Edition • EN 60950-1 Second Edition • IEC 60950-1 Second Edition • AS/NZS 60950-1 • GB4943 Cisco Nexus 9348GC-FXP-B1 ACI-Mode Hardware Installation Guide...
  • Page 62 • CNS13438 Class A EMC: Immunity • EN55024 • CISPR24 • EN300386 • KN 61000-4 series RoHS The product is RoH-6 compliant with exceptions for leaded-ball grid-array (BGA) balls and lead press-fit connectors. Cisco Nexus 9348GC-FXP-B1 ACI-Mode Hardware Installation Guide...
  • Page 63: Leds

    Temperature exceeds the minor alarm threshold. The switch is not receiving power. Green Fans and power supply modules are operational. Amber At least one fan or power supply module is not operating. Cisco Nexus 9348GC-FXP-B1 ACI-Mode Hardware Installation Guide...
  • Page 64: Fan Module Leds

    Power supply is on and outputting power to the switch. Flashing Power supply is connected to a power source but not outputting power to the green switch—power supply might not be installed in the chassis. Power supply is not receiving power. Cisco Nexus 9348GC-FXP-B1 ACI-Mode Hardware Installation Guide...
  • Page 65 Power supply warning—possibly one of the following conditions: • High voltage • High power • Low voltage • Power supply installed in chassis but not connected to a power source • Slow power supply fan Cisco Nexus 9348GC-FXP-B1 ACI-Mode Hardware Installation Guide...
  • Page 66 LEDs LEDs Cisco Nexus 9348GC-FXP-B1 ACI-Mode Hardware Installation Guide...
  • Page 67: Appendix D Additional Kits

    The following table lists and illustrates the contents for the 1-RU rack-mount kit (NXK-ACC-KIT-1RU). Illustration Description Quantity Rack-mount kit • Front brackets (2) • Rear brackets (2) • Slider rails (2) • M4 Phillips pan-head screws Cisco Nexus 9348GC-FXP-B1 ACI-Mode Hardware Installation Guide...
  • Page 68: Rack Mount Kit N3K-C3064-Acc-Kit

    • M4 x 7 mm mounting screws (16) Ground lug kit • Two-hole lug (1) • M4 x 8-mm Phillips pan-head screws (2) Not applicable EAC Compliance document Not applicable Hazardous substances list for customers in China Cisco Nexus 9348GC-FXP-B1 ACI-Mode Hardware Installation Guide...
  • Page 69 Additional Kits Additional Kits The following table lists and illustrates the console cable (CAB-CONSOLE-RJ45) that can be ordered. Illustration Description Quantity Console cable with DB-9F and RJ-45F connectors Cisco Nexus 9348GC-FXP-B1 ACI-Mode Hardware Installation Guide...
  • Page 70 Additional Kits Additional Kits Cisco Nexus 9348GC-FXP-B1 ACI-Mode Hardware Installation Guide...
  • Page 71: Site Preparation And Maintenance Records

    Your completion of each task ensures a successful switch installation. Planning Activity Verification Time and Date Space evaluation: Space and layout Floor covering Impact and vibration Lighting Physical access Maintenance access Environmental evaluation: Ambient temperature Humidity Altitude Atmospheric contamination Airflow Cisco Nexus 9348GC-FXP-B1 ACI-Mode Hardware Installation Guide...
  • Page 72: Contact And Site Information

    Interface equipment (transceivers) EMI evaluation: Distance limitations for signaling Site wiring RFI levels Contact and Site Information Use the following worksheet to record contact and site information for the installation. Contact person Contact phone Cisco Nexus 9348GC-FXP-B1 ACI-Mode Hardware Installation Guide...
  • Page 73: Chassis And Module Information

    Domain name IP broadcast address Gateway/router address DNS address Use the following worksheet to record information about the modules in the switch. Module Slot Module Type Module Serial Number Notes Fan module 1 Cisco Nexus 9348GC-FXP-B1 ACI-Mode Hardware Installation Guide...
  • Page 74 Site Preparation and Maintenance Records Site Preparation and Maintenance Records Module Slot Module Type Module Serial Number Notes Fan module 2 Fan module 3 Power Supply 1 Power Supply 2 Cisco Nexus 9348GC-FXP-B1 ACI-Mode Hardware Installation Guide...

This manual is also suitable for:

N9k-c9348gc-fxp-b1

Table of Contents