FusionModule500 Smart Mini Data Center
User Manual (Philippines, FusionModule500-
SU61A12S)
Contents
4.2.6 Installing Monitoring Devices........................................................................................................................................71
4.2.6.1 Installing the SIM Card and Antenna......................................................................................................................71
4.2.6.2 Installing a PAD.............................................................................................................................................................. 72
4.2.6.3 Installing Remote T/H Sensors for the Smart Cooling Product..................................................................... 75
4.2.6.4 Installing T/H Sensors...................................................................................................................................................75
4.2.6.5 Installing an Electrode Water Sensor...................................................................................................................... 76
4.2.6.6 (Optional) Installing a Server.................................................................................................................................... 77
4.2.6.7 (Optional) Installing a Camera................................................................................................................................. 79
4.2.6.8 (Optional) Installing a LAN Switch..........................................................................................................................82
4.2.6.9 (Optional) Installing a VCN510................................................................................................................................ 83
4.3 Cable Routing......................................................................................................................................................................... 89
4.3.1 System Cabling Rules....................................................................................................................................................... 89
4.3.2 Cable Connections to the Power Supply and Distribution System...................................................................93
4.3.2.1 Grounding the Smart Module....................................................................................................................................93
4.3.2.2 Connecting Cabinet Input Power Cables................................................................................................................94
4.3.2.3 Connecting rPDU Power Cables................................................................................................................................ 94
4.3.2.4 Connecting Cables Between the Lithium Battery and the UPS..................................................................... 95
4.3.3 Management System Cable Connection................................................................................................................... 98
4.3.3.1 Connecting VCN Cables............................................................................................................................................... 98
4.4 Verifying the Installation.................................................................................................................................................... 99
5 Power-On Commissioning................................................................................................. 102
5.1 Power-On Commissioning for the Power Supply and Distribution System................................................... 102
5.1.1 UPS Power-On Commissioning.................................................................................................................................. 103
5.1.2 Connecting the Lithium Battery Supply.................................................................................................................. 104
5.2 Power-On Commissioning for the Cooling System.................................................................................................105
5.2.1 Device Power-On............................................................................................................................................................. 105
5.2.2 Initial Configuration....................................................................................................................................................... 106
5.2.3 Commissioning Procedure............................................................................................................................................ 107
5.3 Management System Power-On Commissioning....................................................................................................109
5.3.1 Preparations and WebUI Login.................................................................................................................................. 109
5.3.2 Preparations and App Login........................................................................................................................................ 112
5.3.3 Initial Startup Password Authentication................................................................................................................. 115
5.3.4 Date and Time................................................................................................................................................................. 118
5.3.5 Creating a Micro-module Plan View........................................................................................................................ 118
5.3.6 Adding a UPS2000G....................................................................................................................................................... 118
5.3.7 Commissioning Sensors................................................................................................................................................ 119
5.3.7.2 Commissioning a T/H Sensor.................................................................................................................................. 120
5.3.7.3 Commissioning the Electrode Water Sensor .....................................................................................................122
5.3.8 Commissioning a Cabinet Electronic Clasp Lock.................................................................................................. 123
5.3.9 Configuring Event Notification................................................................................................................................... 127
5.3.10 Linkage Control............................................................................................................................................................. 135
Issue 02 (2021-06-30)
Copyright © Huawei Technologies Co., Ltd.
vi

Advertisement

Table of Contents
loading

Table of Contents