Table 2.8 Construction Status Checklist

Check Items
System fixing status
(Vertical and horizontal)
System arrangement
status
Locking status and
standard compatibility of
bolts/nuts/washers
External wiring and other
wirings
System cable installation
status
External connector
connection
Other appurtenant work
(Cable duct installation
and others)
Equipment's power
cable specification
Rectifier ↔ System
Cabling Status
Damage of cable sheath
System power connector
System input voltage
(BATT voltage)
Optic Cabling Status
Ground line standard
Ground bar ↔ System
Ground line cabling
status
Termination treatment of
the ground line
(Pressure Terminal)
Criteria
Horizontal and vertical
locations
Horizontal and vertical
locations
Visual inspection and magnet
test
Visual inspection for twist,
array and arrangement
Checking twist, distortion and
installation status
Visual inspection to check
poor contact
(Tightening status)
Visual inspection
Visual inspection
Visual inspection
Visual inspection for twisted
or entangled status
Visual inspection
- Visual inspection to check
whether the power
connector is connected
normally without separation.
- Inspection for the power
connector shaking status
Measurement by digital meter
(voltmeter)
Visual inspection
Visual inspection
Visual inspection
Cabling status check
Visual inspection
Result
Remarks
Pass
Fail