Section 6
Connecting
30
Ensure that the clearance distance accordance with national regulations, for the
highest voltage that may be present within the cabinet. This can be done by ensuring
that the LAN cables are mounted and fixed with sufficient distance to all HLV circuits.
Strictly follow the instructions from the manufacturer for specific types of optical
cables/connectors.
When utilizing galvanic RJ45 SFP ports for the IEDs network connection(s), the
installation shall be done in such way that the electrical power distribution
environment follows Environment A as specified in IEEE 802.3. In other words, the
LAN or LAN segments, with all its associated interconnected equipment, is entirely
contained within a single low-voltage power distribution system and within a single
building.
© 2017 - 2021 Hitachi Power Grids. All rights reserved
1MRK 514 030-UEN Rev. C
Switchgear control unit SAM600-IO
Installation manual