Test Procedure - Sharp R-2275 Service Manual

Commercial microwave oven
Table of Contents

Advertisement

PROCEDURE
LETTER
Initial temperature ......................................................................................................... T1 = 11°C
Temperature after for R-2285 (23 + 2) = 25 sec. .......................................................... T2 = 21°C
Temperature after for R-2275 (35 + 2) = 37 sec. .......................................................... T2 = 21°C
Temperature difference Cold-Warm .............................................................................. ∆T = 10°C
Measured output power
The equation is "P = 180 x ∆T" for R-2285 ........................................ P = 180 x 10°C = 180 Watts
The equation is "P = 120 x ∆T" for R-2275 ........................................ P = 120 x 10°C = 120 Watts
JUDGMENT: The measured output power should be at least
CAUTION: 1°C CORRESPONDS TO 180 WATTS FOR R-2285AND 120 WATTS FOR R-2275.
B
HIGH VOLTAGE TRANSFORMER TEST
WARNING: High voltages and large currents are present at the secondary winding and
CARRY OUT 3D CHECKS
Disconnect the leads to the primary winding of the high voltage transformer. Disconnect the filament and
secondary winding connections from the rest of the HV circuitry. Using an ohmmeter, set on a low range,
it is possible to check the continuity of all three windings. The following readings should be obtained:-
If the reading obtained are not stated above, then the high voltage transformer is probably faulty and
should be replaced.
CARRY OUT 4R CHECKS
C
HIGH VOLTAGE RECTIFIER ASSEMBLY TEST
HIGH VOLTAGE RECTIFIER TEST
CARRY OUT 3D CHECKS.
Isolate the high voltage rectifier assembly from the HV circuit. The high voltage rectifier can be tested
using an ohmmeter set to its highest range. Connect the ohmmeter across the terminal B+C of the high
voltage rectifier and note the reading obtained. Reverse the meter leads and note this second reading.
The normal resistance is infinity in one direction and more than 100 kΩ in the other direction.
CARRY OUT 4R CHECKS
ASYMMETRIC RECTIFIER TEST
CARRY OUT 3D CHECKS.
TEST PROCEDURES (CONT'D)
REPEAT MEASUREMENT IF THE POWER IS INSUFFICIENT.
1000g
1000g
T1˚C
Heat up for 25 sec. (R-2285)
Heat up for 37 sec. (R-2275)
filament winding transformer. It is very dangerous to work near this part when
the oven is on. NEVER make any voltage measurements of the high-voltage
circuits, including the magnetron filament.
a. Primary winding
b. Secondary winding
c. Filament winding
COMPONENT TEST
±
R-2285
approx. 1.3 Ω
approx. 83 Ω
less than 1 ohm
A
D2
D1
ASYMMETRIC
RECTIFIER
C
11
15 % of the rated output power.
1000g
T2˚C
R-2275
approx. 1.5 Ω
approx. 98 Ω
B
HIGH VOLTAGE RECTIFIER
R-2275
R-2285

Advertisement

Table of Contents
loading

This manual is also suitable for:

R-2285

Table of Contents