Samsung MIM-E03CN Installation And Maintenance Manual
Samsung MIM-E03CN Installation And Maintenance Manual

Samsung MIM-E03CN Installation And Maintenance Manual

Air source heat pump
Hide thumbs Also See for MIM-E03CN:

Advertisement

Air Source
Heat Pump
Installation and Maintenance Manual
With Pre-Plumbed Cylinders
Model Numbers
MIM-E03CN
AE050/080/120/160RXYDEG and DGG
October 2019
Greenway Energy Limited
Unit 3 Colemeadow Road
North Moons Moat
Redditch
Worcestershire
B98 9PB
info@greenwayenergyltd.co.uk
30/09/2019 19:24:07

Advertisement

Table of Contents
loading

Summary of Contents for Samsung MIM-E03CN

  • Page 1 Greenway Energy Limited Unit 3 Colemeadow Road North Moons Moat Redditch Air Source Worcestershire B98 9PB info@greenwayenergyltd.co.uk Heat Pump Installation and Maintenance Manual With Pre-Plumbed Cylinders Model Numbers MIM-E03CN AE050/080/120/160RXYDEG and DGG October 2019 30/09/2019 19:24:07...
  • Page 2: Handover Of The System

    Leave these 4 pages with the Homeowner. Thank you for buying a Samsung EHS heat pump system, your Samsung heat pump heats the house and hot water cylinder much like a normal fossil fuel boiler, however there are a couple of differences which you should take notice of.
  • Page 3: General Advice

    Handover of the System General Advice The heat pump comes with a Samsung controller which looks like this, you should not use this or press the buttons, it is used for commissioning and fault diagnosing the system only. On Youtube (search for freedom heat pumps) there are videos showing how to use the controller, faults etc.
  • Page 4 Handover of the System Location Function Operation status display - Displays the operation/function settings and statuses. Operation On/Off button (LED display) - Turns the Air to Water Heat Pump power On/Off Up/Down button - Moves between items vertically or changes the set temperature. Left/Right button - Moves between items horizontally or changes the item value.
  • Page 5: Maintenance Of Monobloc Systems

    Maintenance of Monobloc Systems The Samsung heat pump should be maintained at least once a year to comply with warranty and RHI. Maintenance procedure Stop the unit, clean the water filters, shut the valve, undo the back and pull the strainer out and replace it.
  • Page 6: Installation

    100m from the outdoor unit and as near as possible to the pump, flow switch and any zone valves. The box is 329mm wide, 439mm high, 168mm deep, and weighs 3.5kg The Samsung remote controller MUST be in a heated space above 5 degrees C.
  • Page 7: Heating & Hot Water, Pre-Plumbed Installation

    Heating & Hot Water, Pre-Plumbed Installation...
  • Page 8 Heating & Hot Water, Pre-Plumbed Installation...
  • Page 9 Heating & Hot Water, Pre-Plumbed Installation Run Signal to Heat Pump Valve Z1 Power In Valve Z2 Power In As many heating zone valves as you like can be connected to the system. When commissioning this system, you need to follow the procedure below don’t skip this, if you do the unit won’t work properly Fill in the warranty card on page 4 and 5 Hand the end user pages 6-8.
  • Page 10 Heating & Hot Water, Pre-Plumbed Installation Setting up the controller and the time. Press the gear button, bottom right. Press v, then > option, press OK User Mode, press OK Wired remote controller, press ok LED > to on Button Mute > on Current time >...
  • Page 11: Heating & Hot Water Installation

    Heating & Hot Water Installation...
  • Page 12 Heating & Hot Water Installation...
  • Page 13 Heating & Hot Water Installation Run Signal to Heat Pump Valve Z1 Power In Valve Z2 Power In As many heating zone valves as you like can be connected to the system. When commissioning this system, you need to follow the procedure below don’t skip this, if you do the unit won’t work properly Fill in the warranty card on page 4 and 5.
  • Page 14 Heating & Hot Water Installation Setting up the controller and the time. Press the gear button, bottom right. Press v, then > option, press OK User Mode, press OK Wired remote controller, press ok LED > to on Button Mute > on Current time >...
  • Page 15 Heating & Hot Water Installation Field settings for Hot Water Then v to 30** DHW, press ok, 3011 will be highlit Domestic hot water tank , press OK Press v, to hysteresis thermo off, press ok Go to 302* heat pump, press ok, press v 5 times to 3025 Max DHW operating time, press ok Use ^ and v to set to 60 mins for 200 litre or 90 mins for 300 Litre cylinders, press ok Press v to 303* booster heater, press ok.
  • Page 16: Testing The Unit

    Testing the Unit Use of self-test mode Service mode Press OK to wake the controller up. Press ^ and v together for 6 seconds, password shows you need to set 0202. Press >, then ^ twice, > twice, ^ twice then press OK Please enter your PASSWORD Press v 7 times to self-test mode, press ok...
  • Page 17: Starting The Unit In Heating Mode

    Starting the Unit Starting the unit in heating mode Press the left button so the Zone is highlit in blue, press the power button a temperature will show will show, the unit is automatic mode using an external run signal. Turn up your thermostats or underfloor heating to send a run signal to the unit, the display will change to set 0.0c the pump will start within 3 minutes.
  • Page 18 More Advanced Testing How to read the flow rate from the controller. Press OK to wake the controller up. Press ^ and v together for 6 seconds, password shows you need to set 0202. Press >, then ^ twice, > twice, ^ twice then press OK Press v to indoor zone option, press ok Press v to indoor status information press ok All the sensors are listed including flow sensor.
  • Page 19: Troubleshooting

    Troubleshooting 00 shows on the remote controller 00 shows when the MIM control box is first powered up it means the MIM PCB has activated but no outdoor unit can be seen. Check the F1 F2 wiring is ok between the outdoor and indoor unit and check the outdoor unit has power.
  • Page 20 60°C. Every Samsung heat pump fault code is now available on YouTube, search freedom heat pumps and the fault code and a simple to use video will show you what you need to know.
  • Page 21: What The Unit Comes With And What You Will Need

    The expansion vessel is sized the same way as when using a boiler. If you want to run the system open vented you don’t need these components, the Samsung units are happy to run at anywhere from 0 – 3Bar pressure Pump Your pump needs to supply 12l/min for the 5kW, 20l/min for the 8kW and 30l/min for the 16kW unit.
  • Page 22 What the Unit Comes With and What You Will Need Diverter valves If you require domestic hot water and heating, 2 x 2 port diverter valves are required, you need to supply these and they need to be 28mm diameter. Glycol / anti-freeze In Monobloc heat pumps the water goes outside the building.
  • Page 23: Wiring And Power Supply Information

    Wiring and Power Supply Information Power The EHS system needs 2 power supplies: Outdoor unit, 16 Amp for the 5kW, 20 Amp for the 8kW and 32 Amp for the 16kW. The control box needs a 16 Amp supply, this wires into the top of the breaker (MCB) in the box. Many people remove the MCB from the control box as there is already one in the distribution board.
  • Page 24 Wiring and Power Supply Information The blue cylinder sensor plugs into a yellow socket CNS042 on the controller PCB and into the cylinder in the top ½ of the cylinder. It must install above the immersion heater. You must fix it so it can’t be pulled out of the cylinder. Keep it well away from any mains cables. Thermostats/ timers and under floor heating manifolds The heating is controlled with a field supplied room stat / setback stat, time clock or a run signal from an under floor manifold.
  • Page 25: How To Wire The Electric Meters

    How To Wire The Electric Meters It is now a requirement to measure the electricity being used by the heat pump so the end user can see what the unit costs to run, although the unit can now estimate the energy used we always recommend 2 smart electric meters are used. Ideally it should measure the total draw for the heat pump (outdoor and indoor unit combined).
  • Page 26: Other Systems Possible With Samsung Ehs

    Other Systems Possible With Samsung EHS 2 Heat Pumps Header or Pump HP Buffer Tank Pump Z1 Heating & Hot Water Flow and returns pumped by field supplied pump Pump HP Heating Only Multi Fuel Other Heat Sources into coil...
  • Page 27 Other Systems Possible With Samsung EHS Hybrid Fast Connect Combi Boiler Board is waterproof Boiler must and mounts be set to run outside behind the below 65°C heat pump To Heating Heating Pools Pump HP Pool Pump Header, Buffer or...

Table of Contents