Introduction; Powering Up - GE CTF878 Programming Manual

Clamp-on tag flowmeter
Hide thumbs Also See for CTF878:
Table of Contents

Advertisement

Introduction

Powering UP

Programming Site Data
This chapter provides instructions for entering the programming data
required to place the CTF878 flowmeter into operation. Before the
CTF878 can begin taking measurements and displaying valid data,
the current system and pipe parameters must be entered. Additional
programming options provide access to the more advanced features of
the CTF878, but this information is not required to begin taking
measurements.
Immediately upon power up the CTF878 emits a short beep and
displays a "PCI Loader" message. It then validates the instrument
programming, and displays the GE Sensing logo and the software
version. If the meter fails any of these tests, contact the factory.
After the meter conducts all the self checks, the screen then appears
similar to the one shown in Figure 1-1 below.
DEFAULT
0
50
Figure 1-1: Screen After Powering ON
2003/07/17
03:35 PM
100
February 2009
1-1

Advertisement

Table of Contents
loading

Table of Contents