2.4.3. Installing Wires in Receptacle Contact Springs

Use the following procedure to ensure a good electrical and mechanical connection
between the conductor wire and the receptacle contact spring. Table 2-1 identifies the
correct crimping tool to be used when installing wires in a receptacle contact spring.
AMP
Crimping
Wire Size
Tool PN
J397138
#10 / #12 AWG
J397139
#14 / #16 AWG
J397188
#18 / #20 AWG
1. Strip 3/16 in. (0.187 in. or 0.47 cm.) of insulation from the end of the wire.
2. Place the receptacle contact spring into the jaws of the proper crimping tool.
When using only one terminal, of any wire size, use the shortest terminal.
3. Partially close the crimping tool jaws against the receptacle contact spring to hold
it in place. (Do not crush the receptacle contact spring barrel at this time.)
4. Insert the stripped end of wire all the way into the receptacle contact spring
barrel. Squeeze the tool handles until crimping is completed and the jaws
release. When using both terminals, it is more convenient to attach the first wire
to the longest terminal.
Copyright 2019

Figure 2-2 - Receptacle Contact Springs Installed

Table 2-1. Crimping Tools

Old-Style Receptacle
Contact Spring
J680165 (Standard)
SM 4574F, Rev. 4, March 2019
Improved Base Receptacle Contact
J680181
J680179
PV-250 Track Relay
Spring
M451142-2703
M451142-2702
M451142-2701
2-4

Advertisement

Table of Contents
loading

This manual is also suitable for:

N342555809N342555909

Table of Contents