Non Standard Installations - Black & Decker Price Pfister 0X8 Series Instructions Manual

Tub & shower single control, pressure balancing valve body
Table of Contents

Advertisement

Available languages

Available languages

16
16A
16B
16 PLASTERGUARD REPLACEMENT
Replace plasterguard (16A) into Valve Body and secure with Screws (16B).
Proceed to finish wall.
17
1
1
/
" Dia
4
1
1
/
" Dia
4
17 FINISH WALL PREPARATION
Make appropriate holes to finished wall. Price Pfister recommends that all Tub
Spout and Shower Outlet holes be 1 1 / 4 " diameter. For center hole on plaster
wall use 4 3 / 4 " diameter.
CAUTION: Make sure that leak tests and flushing are performed before
preparing the finished wall.
ENGLISH
18
18 THIN WALL INSTALLATION
Knock out Center Section (18A) of Plaster Guard (18B) and remove screws
(18D). For installation of thin walls, use Support Plate (18C) in addition to
Plaster Guard (18B). For installation to other wall types, do not use Support
Plate (18C). Use of Plaster Guard (18B) is optional. For center hole on a thin
wall use 4" diameter.
19
3
4
/
" Dia
4
19 REVERSED INLET LINES
If hot and cold inlets are reversed (back-to-back installation), (19C) unscrew the
plasterguard and bonnet assembly. Rotate the bonnet assembly (19A) 180°
with notch (19B) facing up and reassemble.
6

NON STANDARD INSTALLATIONS

18B
18C
SHWR
4" Dia
TUB
18D
19C
HOT
COLD
19A
18B
18A
18C
19B
COLD
HOT
180°
19A

Advertisement

Table of Contents
loading

Table of Contents