Download Print this page
Halsey Taylor SJ2 Owner's Manual

Halsey Taylor SJ2 Owner's Manual

Refrigeration package

Advertisement

Quick Links

Halsey Taylor Owners Manual
Note: Danger! Electric shock hazard. Disconnect power before servicing unit.
LEGEND
A= 1/4" (6mm) O.D. TUBE WATER OUT
B = 1/4" (6mm) O.D. TUBE WATER INLET
C = TEMPERATURE ADJUSTMENT
D = ELECTRICAL
SJ2Q*1B
SJ2
Refrigeration Package
USES HFC-134A REFRIGERANT
NOTE: It is important to insure proper ventilation. Allow a
minimum clearance of 6 inches (152 mm) in front and 3 inches
(76mm) in the rear of the unit. If unit is to be installed in an
enclosure, allow the following clearances around unit - 1 inch
(25mm) each side, 3 inches (76mm) in the rear, 3 inches (76mm)
inches above wall.
This chiller has been designed for use with potable water ONLY.
98708C (Rev. C - 05/16)

Advertisement

loading

Summary of Contents for Halsey Taylor SJ2

  • Page 1 SJ2Q*1B Halsey Taylor Owners Manual Refrigeration Package Note: Danger! Electric shock hazard. Disconnect power before servicing unit. USES HFC-134A REFRIGERANT NOTE: It is important to insure proper ventilation. Allow a minimum clearance of 6 inches (152 mm) in front and 3 inches (76mm) in the rear of the unit.
  • Page 2 SJ2Q*1B INSTALLATION ITEM PART DESCRIPTION 1. It is important to insure proper ventilation. For remote installation a minimum clearance of 6 inches (152 mm) to the front must be maintained, 1 inch (25 mm) each side, 3 inches (76 mm) to the rear above the unit.