Cleaner Arm Assembly; F/E Head; A/C Head Base Assembly - LG LGXBR342 Service Manual

Vcr+dvd recoder
Hide thumbs Also See for LGXBR342:
Table of Contents

Advertisement

DECK MECHANISM DISASSEMBLY

F/E Head

(Fig. A-3-2)
9. Cleaner Arm Assembly (Fig. A-3-1)
1) Carefully pry tab "A" (see Fig.A-3-1) to clear the
embossed tab on the chassis. Turn the Cleaner Arm
Assembly clockwise and lift it from the chassis.
10. F/E Head (Fig. A-3-2)
1) Carefully pry tab "A" (see Fig.A-3-2) to clear the
embossed tab on the chassis. Turn the Cleaner Arm
Assembly counter-clockwise and lift it from the chassis.
(A)
Chassis
Fig. A-3
Cleaner
Arm Assembly
(Fig. A-3-1)
(A)
(S4)
11. A/C Head Base Assembly (Fig. A-3-3)
1) Remove the Screw (S4) and lift the A/C Head Base
Assembly up.
4-5

A/C Head Base Assembly

(Fig. A-3-3)

Advertisement

Table of Contents
loading

Table of Contents