T T T T T ABLE OF CONTENTS ABLE OF CONTENTS ABLE OF CONTENTS ABLE OF CONTENTS ABLE OF CONTENTS HORIZONTAL PIPING .................. PAGES 1-10 WARNINGS ....................PAGE 1 INSTALLATION ..................PAGES 2-3 TYPICAL INSTALLATION ................. PAGE 4 FLEX-L PIPING COMPONENTS ............... PAGE 5 HEAT FAB PIPING COMPONENTS ............
VENTING SHOULD BE DONE ONLY BY A QUALIFIED EXPERT AND VENTING SHOULD BE DONE ONLY BY A QUALIFIED EXPERT AND IN ACCORDANCE WITH THE APPROPRIATE OLSEN MANUAL. IN ACCORDANCE WITH THE APPROPRIATE OLSEN MANUAL. IN ACCORDANCE WITH THE APPROPRIATE OLSEN MANUAL.
HORIZONTAL VENT INSTALLATION: HORIZONTAL VENT INSTALLATION: HORIZONTAL VENT INSTALLATION: HORIZONTAL VENT INSTALLATION: HORIZONTAL VENT INSTALLATION: A. The boilers covered in this section are design-certified as CATEGORY 3 for venting, only when they are installed with manufacturer specified vent system components and installation practices.
CONDENSATE DRAINS CONDENSATE DRAINS CONDENSATE DRAINS CONDENSATE DRAINS CONDENSATE DRAINS (Note: A condensate drain is not required on models ODV150 thru 200) WARNING: WARNING: WARNING: WARNING: WARNING: DO NOT PLACE CONDENSATE DRAIN WHERE FREEZING MAY OCCUR. CONDENSATE DRAINS ARE REQUIRED IN THE VENT WHEN USING THE CONDENSATE TEE.
Page 13
VERTICAL TICAL TICAL TICAL VENT PIPE INST VENT PIPE INST VENT PIPE INST VENT PIPE INSTALLA ALLA ALLATION ALLA TION TION TION TICAL VENT PIPE INST ALLA TION I N S T R U C T I O N S I N S T R U C T I O N S I N S T R U C T I O N S I N S T R U C T I O N S...
Page 14
given; this is known as the horizontal vent connector run. The vent or chimney height is also usually given as the Btuh input of the gas appliances served by the vent. Check these parameters to be sure the venting system will work. Use approved engineering practices and part 7 &...
Page 15
WARNING: WARNING: WARNING: WARNING: WARNING: Do not connect this CATEGORY 1 boiler to a vent system used by a CATEGORY 3 and 4 appliance. Do not connect it to vents with mechanical draft systems operating at positive pressure. Improper venting could allow combustion products to collect in the structure during use, resulting in damage, injury or death.
Page 16
1. Terminate all vertical vents with a listed vent cap or roof assembly unless local codes require otherwise. See vent cap or roof assembly manufacturer’s instructions. Locate vent termination (vent cap or roof assembly) in an area without positive pressures or eddy currents.
HEIGHT ROOF PITCH ABOVE ROOF FLAT TO 7/12 1.0 FT. OVER 7/12 TO 8/12 1.5 FT. OVER 8/12 TO 9/12 2.0 FT. OVER 9/12 TO 10/12 2.5 FT. BRACE TO ROOF OVER 10/12 TO 11/12 3.3 FT. AT TOP OVER 11/12 TO 12/12 4.0 FT.
Page 18
B. Examine vent or chimney cleanouts to make sure they remain tightly closed when not in use. Make sure vent or chimney passageway is clear and free of obstructions. Look for evidence of condensate or deterioration in vent or chimney. Either of these means an inadequate vent.
Page 19
TICAL TICAL VENTING INST VENTING INST ALLA ALLA TION FOR TION FOR VERTICAL TICAL TICAL VENTING INST VENTING INST VENTING INSTALLA ALLA ALLATION FOR TION FOR TION FOR (TYPE B (TYPE B (TYPE B VENT) (TYPE B (TYPE B VENT) VENT) VENT) W/ N VENT)