Commissioning; Check Before Power-On; Powering On The Sun2000 - Huawei SUN2000-100KTL Series User Manual

Hide thumbs Also See for SUN2000-100KTL Series:
Table of Contents

Advertisement

SUN2000-(100KTL, 110KTL, 125KTL) Series
User Manual

6.1 Check Before Power-on

No.
1
2
3
4
5
6

6.2 Powering On the SUN2000

Precautions
● Before turning on the AC switch between the SUN2000 and the power grid, use
● If the solar inverter has been stored for more than two years, it must be
Issue 07 (2020-09-15)
Acceptance Criteria
The solar inverter is installed correctly and securely.
The DC switches and the downstream AC switch are OFF.
All cables are connected correctly and securely.
Unused terminals and ports are locked by waterproof caps.
The installation space is proper, and the installation environment
is clean and tidy.
The maintenance compartment door is closed and the door
screws are tightened.
NO TICE
a multimeter set to the AC position to check that the AC voltage is within the
specified range.
checked and tested by professionals before being put into use.
Copyright © Huawei Technologies Co., Ltd.
6

Commissioning

6 Commissioning
69