  • Page 1 Neo DC KNAPSACK SPRAYER Instruction Manual...
  • Page 2 CONTENTS Assembly the sprayer 11-12 10. Calibration Sheet Formula................15 1. DESCRIPTION Nozzle...
  • Page 3 2. SPECIFICATION (see page 3 for information on selection) 3. OPERATING NEO DC SPRAYER...
  • Page 4 The NEO DC SPRAYER is supplied with range of different nozzles. Using the table below as a guide select and fit the nozzle most appropriate to spray application from those supplied .
  • Page 5: Table Of Contents

    ASSEMBLING THE SPRAYER The sprayer is supplied with: - spray lance. - trigger. - a selection of nozzle tips and spares. Spray Lance -Screw the lance onto the trigger unit. Do not overtighten. -Select an appropriate nozzle and attach to the spray lance using the nozzle cap. DIFFERENT NOZZLE TYPE ASSEMBLY 1) Washer 2) Elbow...
  • Page 6 CALIBRATION Before using the Neo DC, the sprayer should be calibrated using water. This is important as accurate calibration ensures that the correct dose of product is applied. Poor calibration can result in either over-dosing or under-dosing both of which are wasteful.
  • Page 7 MIXING AND FILLING Mixing and lling is generally the most hazardous process in the spraying operation. Always read the label to ensure that you know the correct dose of pesticide to use and follow the instructions regarding usage. Make sure that you are wearing the correct protective clothing for the particular product.
  • Page 8 SPRAYING When spraying make sure that The best time to spray is you always wear the best early in the morning or late protective equipment available afternoon. to you. Consult the label to nd temperature and humidity out what is advised for the are lower at these times of product you are using.
  • Page 9 AFTER SPRAYING...
  • Page 10 However the battery needs to be recharged every 2-3 months. MAINTENANCE With regular cleaning and battery maintenance the NEO DC SPRAYER should give many years trouble free operation. Simple maintenance involves regularly cleaning the sprayer both internally and externally.
  • Page 11 6. TROUBLE SHOOTING The NEO DC SPRAYER, if properly maintained will prove highly reliable. However, the following procedures may assist in remedying possible operating difficulties. Pump does not operate when press the trigger Battery flat or the switch in the OFF position.
  • Page 12 NEO-DC 16L PARTS DIAGRAM B A T T E R Y...
  • Page 14: Elbow 2 3 4 5 6

    NEO-DC16L PARTS LISTING STTK-017-10000 Ba ery Cha rger STTK-017-10001 Ba ery Sta nd STTK-017-10009 Screw STTK-017-10003 DC12V, 8A Ba ery STTK-017-10004 Hos e 8" STTK-017-10022 Socket STTK-017-10023 Socket Cover STTK-017-10005 Socket wi th Cover STTK-017-10024 Power Control Adjus ter STTK-017-10025 PCA Knob STTK-017-10006 Power Control Adjus ter wi th Knob...
  • Page 15: Cone Nozzle

    NEO-DC SPRAYER PERIODIC CHANGE CHECK LIST STTK-017-10000 Ba ery Cha rger STTK-017-10001 Ba ery Sta nd STTK-017-10009 Screw STTK-017-10003 DC12V, 8A Ba ery STTK-017-10004 Hos e 8" STTK-017-10022 Socket STTK-017-10023 Socket Cover STTK-017-10005 Socket wi th Cover STTK-017-10024 Power Control Adjus ter STTK-017-10025 PCA Knob STTK-017-10006 Power Control Adjus ter w h Knob STTK-017-10013 Swi tch...
  • Page 16 CALIBRATION WORKING SHEET Use this sheet to help make the calibration calculations. Fill in the boxes and transfer this information as shown. FLOW RATE MEASURED WALKING SPEED MEASURED SWATH WIDTH MEASURED TOTAL SPRAY VOLUME Number of knapsack loads Needed per hectare Volume of product needed Per hectare (from product Label)
  • Page 17 NOTES...
  • Page 18 RB Spray Tech Sdn Bhd (627487-D) No. 44, Lorong Sanggul 1E, Bandar Puteri Klang, 41200 Klang, Selangor D.E., Malaysia : +60-3-51625746, 51625745 : +60-3-51615741 E-mail : info@rbspraytech.com www.rbspraytech.com rbspraytech@unifi.my YOUR KEY TO SMART TECHNOLOGY DRAFT09...