Huawei RTN 360 V100 Quick Installation Manual page 7

Hide thumbs Also See for RTN 360 V100:
Table of Contents

Advertisement

Installing an RTN 360
2
Installing RTN 360s at 2x(1+0) Aggregation Sites
Installation procedure
1
Install the ground cable.
2
Install an RTN 360 on a pole or wall.
Connect an outdoor network cable to port P&E on each
3
RTN 360 and lay out the cable.
Power over ethernet supports a maximum distance of 100 meters.
Use an outdoor network cable to connect GE ports on the two RTN
4
360s.
Commissioning procedure
Connect the other end of the outdoor network cable to Port
5
P&E1/P&E2 on the PI to power on the RTN 360.
•The PI transmits both service and power signals to one
RTN 360 and only power signals to the other RTN 360.
•A GE port on the PI connects to the peer wireless
device.
•For details about how to install a PI and cables, see
the OptiX RTN PI-AC B20 Product Overview and
Installation Guide.
Load commissioning data to the RTN 360s using
6
the Web LCT.
7
Align each RTN 360 with its peer.
Ensure that the RSLs of the two RTN 360s meet
8
the requirements.
9
Verify the installation.
12/13 >>
Receives GE
service signals.
1
Receives only power
signals.
RTN 360
Receives both GE
2
service signals and
power signals.
External power
supply equipment
RTN 360
2
Optional: Install the
RTN 360 on a pole.
3
2
Optional: Install the
RTN 360 on a wall.
4
3
B20 PI
Port GE1, which is connected to the wireless
equipment at the opposite end
Port P&E1, which is connected to one RTN 360
Port P&E2, which is connected to the other RTN 360
4
2
Instal
Wireless equipment at
the opposite end

Advertisement

Table of Contents
loading

Table of Contents