For Operators: Maintenance; Inspections; Review; Details For The Inspections - Sharp ND-RC Series Installation Manual

Pv modules with standard frames 50 mm, with frames 40 mm
Table of Contents

Advertisement

Fig. 9b
Mounting drawings for tested snow load
All dimensions are shown in mm. ∆H is the clearance between bottom side of the module frame and
surface mounting area. Permissible clamping area for the test shown as red crosses.
8

For operators: maintenance

Inspect and maintain your system to:
• Keep it safe and reliable
• Achieve top output
• Prevent damage and
• Protect your investment.
It is recommended to carry out regular inspections
and to do maintenance so that any problems can be
discovered reliably, and rectified.
RECOMMENDATION
• It is recommended to do annual inspections
and a more thorough inspection and measurement
every 4 years.
• It is also recommended to use a monitoring system
to identify any outages or problems quickly.
• Inspecting the output of your photovoltaic system
regularly can help to discover problems promptly,
and ensures your photovoltaic system operates at
top performance, preventing loss of output.
For the proper maintenance and repair of your solar
photovoltaic system, contact installer.
8.1

Inspections

Bolting
horizontal / vertical
990
990
Clamping
Long frame side,
horizontal / vertical
200
130
130
200
min 315
max 415
min315
max 415
An inspection every year is recommended. This
should be a visual inspection. Refer to Ch. 8.3: „Details
for the inspections".
The inspection includes the following aspects.
8.1.1 Inspecting the generator
• Strings: condition of the insulation and mounting
• Condition of the junction box
• Condition of the visible connectors
• Condition of the earthing conductors
• for direct earthing: connection of the earthing
conductors on the frames
• for indirect earthing: connection of the frames to
the sub-structure and the earthing conductors to
the sub-structure
• Condition of the mounting system (in peripheral
area)
• Dirt on modules: type and degree of dirt
• Shade circumstances (e.g. from trees or
neighbouring houses)
Clean the components, if necessary.
8.1.2
Inspecting the documentation and drawings
• Checking the PV module string plan
• Check the inverter's status reports
• Determine and archive the annual output
• Create and archive the inspection report.
8.2

Review

Carrying out a thorough review at least every 4 years
is recommended. This includes the following work in
11
In-Lay system
Long frame side,
horizontal / vertical
,
6

Advertisement

Table of Contents
loading

Table of Contents