Download Print this page

GE RAK4002D Installation Instructions Manual

Junction box kit for az45/az65 series zoneline

Advertisement

Available languages

Available languages

Quick Links

Before you begin - Read these instructions completely and carefully.
IMPORTANT – OBSERVE ALL GOVERNING CODES AND ORDINANCES.
Note to Installer – Be sure to leave these instructions with the Consumer.
Note to Consumer – Keep these instructions with your Owner's Manual for future reference.
Tools Needed
• 5/16" Nut Driver
• 1/4" Nut Driver
Important Notes
• This unit must be properly grounded.
• Connections are made inside this junction box
assembly.
• This kit provides for connection of 1/2" trade
size electrical conduit and connection to a
wiring system in accordance with the National
Electric Code. ANSI/NFPA No. 70-2014.
It also provides for use with optional sub-
base and chaseway RAK204U/RAK205CW,
RAK204D15*, RAK204D20*, RAK204D30*,
RAK204E15*, RAK204E20*, and RAK204E30*.
• This kit contains 2 junction boxes, one for use
on AZ45/AZ65 series Zonelines with steel
control box cover and one for use on units with
molded plastic BMC control box cover.
* All Series
Parts Included
• 2 Junction box assemblies
• Mounting screws (4 for steel, and 3 for molded
plastic BMC)
• Wire retaining clip
Installation Instructions
for your new
RAK4002D
Junction Box Kit
For AZ45/AZ65 Series Zoneline
WARNING
RISK OF ELECTRIC SHOCK.
Disconnect the electrical power supply before
wiring connections.
INSTALLATION NOTES
Reference Installation Instructions in the Zoneline
Owner's Manual.
A. Branch Circuit Connection 230/208 volt
To connect branch circuit to unit using
direct wiring, use properly rated wire nuts
and enclose fully within junction box.
B. For use with sub-base and chaseway
Branch circuit wires can be run from the
sub-base, up the chaseway and into the
junction box where connections are made.
Electrical connections can be made directly
to the branch circuit with properly rated
wire nuts or by plug through receptacle
of appropriate sub-base. See additional
Installation Instructions with the sub-base kit.
Power supply kits or unit cords can be run
from the junction box, down the chaseway
and into the sub-base.
31-5000335 Rev. 0 03-19 GEA

Advertisement

loading

Summary of Contents for GE RAK4002D

  • Page 1 Installation Instructions for your new RAK4002D Junction Box Kit For AZ45/AZ65 Series Zoneline Before you begin - Read these instructions completely and carefully. IMPORTANT – OBSERVE ALL GOVERNING CODES AND ORDINANCES. Note to Installer – Be sure to leave these instructions with the Consumer.
  • Page 2: Installation Instructions

    • If steel, use junction box labeled RAK4002C. Proceed to step 2. • If molded plastic BMC, use junction box labeled RAK4002D. Proceed to step 3. STEP 2: ZONELINE MODELS WITH STEEL CONTROL BOX COVER 2C. ATTACH WIRING USING A SUB-BASE 2A.
  • Page 3: Install Junction Box

    Installation Instructions DIRECT ELECTRICAL CONNECTION 2F. INSTALL JUNCTION BOX COVER 2D. INSTALL JUNCTION BOX 1. Carefully tuck all wires and connections back Install the junction box by inserting the left tabs inside the junction box. Be sure there are no into control box cover slots, and aligning two screw loose connections or stray uninsulated wires holes inside the upper and lower enclosure.
  • Page 4 Installation Instructions STEP 3: INSTALL JUNCTION BOX ON MOLDED PLASTIC BMC CONTROL BOX COVER 3C. ATTACH WIRING USING A SUB-BASE 3A. SELECT ELECTRICAL AND CHASEWAY (sold separately) CONNECTION METHOD 1. Remove the rectangular knockout at the bottom of • For Conduit Installation: Use the hole in the bottom the junction box.
  • Page 5 Installation Instructions ZONELINE SERIES – DIRECT ELECTRICAL CONNECTION 3F. CONNECT THE POWER • Install the junction box base by inserting the upper SUPPLY KIT and lower tabs into the upper and lower slots on the Plug the power connectors, ensuring plug is fully molded control box cover.
  • Page 6 Instructions d’installationde votre nouvel ensemble de boîte de jonction RAK4002D Modèles Zoneline Séries AZ45/AZ65 Avant de commencer – Lisez ces instructions attentivement et en totalité. IMPORTANT – OBSERVEZ TOUS LES CODES ET RÈGLEMENTS EN VIGUEUR. Remarque à l’installateur – Assurez-vous de remettre ces instructions au consommateur.
  • Page 7: Instructions D'installation

    • S’il s’agit d’acier, utilisez une boîte de jonction étiquetée RAK4002C. Passez à l’étape 2. • Si le plastique BMC est moulé, utilisez une boîte de jonction étiquetée RAK4002D. Passez à l’étape 3. ÉTAPE 2 : MODÈLES ZONELINE AVEC COUVERCLE DE BOÎTE DE COMMANDE EN ACIER 2C.
  • Page 8 Instructions d’installation CONNEXION ÉLECTRIQUE DIRECTE 2F. POSER LE COUVERCLE DE LA 2D. POSER LA BOÎTE DE JONCTION BOÎTE DE JONCTION Poser la boîte de jonction en insérant les languettes 1. Placez avec précaution tous les fils et les connexions de gauche dans les fentes du couvercle de la boîte de à...
  • Page 9 Instructions d’installation ÉTAPE 3: INSTALLERLA BOÎTE DE JONCTION SUR LE COUVER- CLE DE BOÎTE DE COMMANDE EN PLASTIQUE MOULÉ BMC 3C. ATTACHER LE CÂBLE À L’AIDE D’UN 3A. SÉLECTIONNER LA MÉTHODE DE SOCLE ET D’UN CHEMIN DE CÂBLE BRANCHEMENT ÉLECTRIQUE (VENDUS SÉPARÉMENT) •...
  • Page 10 Instructions d’installation ZONELINE SERIES – DIRECT ELECTRICAL CONNECTION 3F. BRANCHER LES CONNECTEURS ÉLECTRIQUES • Installezla base de la boîte de jonction en insérant les languettes supérieure et inférieure dans les fentes Branchez les connecteurs électriques, en vous assurant que supérieure et inférieure sur le couvercle de la boîte de com- la fiche est insérée à...