Download Print this page
Samsung 5G CPE Quick Start Manual
Samsung 5G CPE Quick Start Manual

Samsung 5G CPE Quick Start Manual

Verizon
Hide thumbs Also See for 5G CPE:

Advertisement

Quick Links

5G CPE Quick Start Guide
Verizon Wireless 5G CPE
Thank you for purchasing a 5G CPE that will provide your home with 5G service.
Use this guide to help you set up your CPE for first use, learn how to connect to it, and verify that you are under 5G CPE
coverage.
In the box
Your 5G CPE package contains the following components:
a
5G CPE Indoor
b
AC/DC Adapter
c
Power cord
d
Ethernet cable
Quick Start Guide and Product Safety
e
and Warranty Information

Interface Overview

RESET
SIM
Verizon 5G Indoor CPE_Quick Installation Guide(A4).indd 1
LED (Power)
LED (Signal strength)
LED (Connection)
LED (Alarm)
USB
POWER
LAN
a

Before You Begin

Go to www.verizonwireless.com/support/5gcpe and print
the User Guide.
5G CPE Requirements
• Signal Strength LED needs to be green or yellow once
turned on
Installation
Choose a location and place your 5G CPE on a flat surface.
Consider following factors:
• Install the CPE close to window or wall to face a guided
direction from your service provider (Check the direction
mark at the bottom of the CPE stand).
• 10 feet away from the products that generate
electromagnetic radiation (e.g. a microwave oven)
• A flat surface without obstructions
c
b
d
Quick Start Guide and
Product Safety and
Warranty Information
2018-01-11 오후 4:09:08
e

Advertisement

loading

Summary of Contents for Samsung 5G CPE

  • Page 1: Interface Overview

    Thank you for purchasing a 5G CPE that will provide your home with 5G service. Use this guide to help you set up your CPE for first use, learn how to connect to it, and verify that you are under 5G CPE coverage.
  • Page 2: Connecting Cables

    3. Insert one end of the power cord into the AC/DC adapter and then plug the other end into an available outlet. Confirm your 5G CPE in Service Test Your Internet Connection When the CPE powers on, the Power/Status Indicator LED Once the CPE is in service, you can connect the other will be solid green.