FAA Approved Installation Manual for the EDM-960 system
Primary Engine Data Management System
1.
Revisions ___________________________________________________________________________________ 2
2.
Read This First _____________________________________________________________________________ 2
3.
Instrument Marking ________________________________________________________________________ 3
4.
Primary TSO Label __________________________________________________________________________ 3
5.
6.
Alarm hierarchy ____________________________________________________________________________ 5
7.
Dimming ____________________________________________________________________________________ 5
8.
9.
11. Probe Wiring _______________________________________________________________________________ 12
12. Wiring Markings ___________________________________________________________________________ 13
25. GPS Interface ______________________________________________________________________________ 24
29. EMI Radio Test: ____________________________________________________________________________ 28
The Owner of the EDM-960 must keep this manual
TABLE OF CONTENTS
J.P. INSTRUMENTS PO BOX 7033 HUNTINGTON BEACH CA
Last printed 1/22/2013 11:09:00 AM
Report No 909
Page 1 of 45 Rev C
Date 12-12-12