Epson AN2WA87 Installation Instructions Manual

All-in-one collaborative whiteboard an2 series 87" and 100"

Advertisement

Quick Links

I N S T A L L A T I O N I N S T R U C T I O N S
Epson All-in-One Collaborative Whiteboard
AN2 87" and 100"
AN2 Series

Advertisement

Table of Contents
loading

Summary of Contents for Epson AN2WA87

  • Page 1 I N S T A L L A T I O N I N S T R U C T I O N S Epson All-in-One Collaborative Whiteboard AN2 87" and 100" AN2 Series...
  • Page 2: Important Safety Instructions

    IMPORTANT ! : The AN2 Series includes the AN2 87" and 100" mounts. These mounts are designed to be used ONLY with the following Epson projector models: • BrightLink Pro 1430Wi • BrightLink Pro 1420Wi IMPORTANT SAFETY INSTRUCTIONS •...
  • Page 3 Installation Instructions AN2 Series DIMENSIONS AN2-87 DIMENSIONS: INCHES [MILLIMETERS] AN2-100 DIMENSIONS: INCHES [MILLIMETERS]...
  • Page 4: Installation Instructions

    AN2 Series Installation Instructions LEGEND Tighten Fastener Pencil Mark Apretar elemento de fijación Marcar con lápiz Befestigungsteil festziehen Stiftmarkierung Apertar fixador Marcar com lápis Serrare il fissaggio Segno a matita Bevestiging vastdraaien Potloodmerkteken Serrez les fixations Marquage au crayon Loosen Fastener Drill Hole Aflojar elemento de fijación Perforar...
  • Page 5: Tools Required For Installation

    Installation Instructions AN2 Series TOOLS REQUIRED FOR INSTALLATION #1, #2 3/8" 1/8" (wood) 7/16" 1/2" (drywall) 8mm (concrete) 3/8" 6mm (concrete - AF6 toggler) 7/16" PARTS 9200-003827 D (1) [Right valence bracket] C (1) A (1) B (1) [Left valence bracket] [Upper wall [Wall hanging bracket]...
  • Page 6: Installation

    AN2 Series Installation Instructions INSTALLATION Determining Location 2 3/4” [70mm] 10 5/8” [270mm] HEIGHT FROM FLOOR FLOOR Figure 1 Table 1: Fastener Information Determine desired height of whiteboard (measured from floor). (See Figure 1) Determine desired center of whiteboard. (See Figure 1) WALL TYPE PILOT FASTENERS (see...
  • Page 7 Installation Instructions AN2 Series Installing Wall Bracket Tighten fastener against wall bracket. (See Figure 3) Slide the tabs on the upper wall bracket (A) into the slots on Determine location of studs behind drywall, and mark a wall hanging bracket (B). (See Figure 2) minimum of two locations for wall bracket attachment over studs.
  • Page 8 AN2 Series Installation Instructions Installing Boom Projector Mount (AN2-100 Only) Turn adjustment bolt to move projector mount towards end of boom arm, until front of adjustable IMPORTANT ! : The boom projector mount ships ready "100" plate lines up with marking on boom arm.
  • Page 9 Figure 7) Continue to adjust until whiteboard is leveled with the wall. Remove and keep one fastener from bottom of sensor. NOTE: The sensor is included with the Epson projector, not the AN2BA Series mount. (W) x 2 Figure 8...
  • Page 10: Installing Projector

    AN2 Series Installation Instructions Installing Projector Attach projector interface (T) to projector using four M4 x 12mm Phillips cap head screws (V). (See Figure 10) Latch Slot (V) x 4 UNLOCKED LOCKED Slot Figure 10 NOTE: Make sure projector mount is in UNLOCKED position and remove key from projector mount.(See Figure 11) Buttons Lift projector with attached interface (T) and slide buttons on...
  • Page 11 Tighten yaw adjustment locking screw using a #2 Phillips projector adjustments following instructions included with screwdriver. (See Figure 14) Epson projector and using the following adjustment instructions for the mount. IMPORTANT ! : The projected image should NEVER project onto the whiteboard frame. An image overlapping onto the whiteboard frame may prevent the projector touch sensor from working properly.
  • Page 12 AN2 Series Installation Instructions Pitch Adjustment (Vertical Elevation) Adjust projector so that the top and bottom horizontal lines of the test pattern are parallel with each other and with top and bottom of whiteboard. Loosen pitch adjustment locking screw using a #2 Phillips screwdriver.
  • Page 13 Installation Instructions AN2 Series Installing Control Housing Align holes in control pad with bosses in control housing and push control pad into place. (See Figure 18) Open door on control panel assembly (EE). Secure control pad into place using two #4-24 x 1/4" Phillips Insert edges of control panel assembly (EE) into groove in pan head screws (DD).
  • Page 14 AN2 Series Installation Instructions Adding Whiteboard Brackets to Whiteboard NOTE: Use 3 whiteboard brackets (minimum of 2 brackets) along bottom of whiteboard, and locate brackets as close to outer corners as possible. Remaining brackets may be used along sides of whiteboard, as desired. Install whiteboard brackets (MM) using: •...
  • Page 15 Installation Instructions AN2 Series Calibrating Finger Touch Unit (FTU) Snap calibration marker spacers (QQ) into bottom of calibration markers included with Epson projector. (See Figure 23) NOTE: Ensure that magnet on calibration marker spacer (QQ) lines up with target on calibration marker.
  • Page 16 AN2 Series Installation Instructions FASTENER INSTALLATION METHODS Steel stud NOTE: Refer to Table 1 for appropriate hardware and pilot hole (if present) sizes for various wall types. Drywall Steel Stud / Drywall Plastic cap Hold metal channel on anchor (H) flat alongside plastic straps and slide channel through hole.
  • Page 17 Installation Instructions AN2 Series Wood Stud NOTE: Refer to Table 1 for appropriate hardware and pilot hole sizes for various wall types. Use one 1/4 x 2-1/2" lag bolt (J) through product and into pilot hole. (See Figure 31) Repeat for remaining pilot hole. (J) x 2 Figure 31 Concrete...
  • Page 18 AN2 Series Installation Instructions...
  • Page 19 Installation Instructions AN2 Series...
  • Page 20 AN2 Series Installation Instructions Milestone AV Technologies 8800-002671 Rev02 3100 North Detroit Street, Warsaw, IN 46582 06/15 P: 574.267.8101 or 800.622.3737 F: 574.267.7804 or 877.325.4832 E: info@da-lite.com www.milestone.com © 2015 Milestone AV Technologies LLC...

Table of Contents