Switching The Server Node On And Off - Fujitsu PRIMERGY CX2550 M4 Operating Manual

Server node
Hide thumbs Also See for PRIMERGY CX2550 M4:
Table of Contents

Advertisement

6.2

Switching the server node on and off

The multi-node server system consists of up to four server nodes. Each server
node installed in the server enclosure works independently.
I
The server nodes are controlled via related operating panel areas on the
front side of the CX400 M4 server enclosure. See "FUJITSU Server
PRIMERGY CX400 M4 Server Enclosure Operating Manual".
V
CAUTION!
It nothing appears on the screen but flickering stripes after switching
on the server node, switch the server node off immediately (see
chapter
The On/Off button does not disconnect the server node from the
mains voltage. To completely disconnect it from the mains voltage,
remove the power plug(s) from the socket(s).
Do not move, strike, or shake the server node when it is turned on.
This can damage the hard disk in the server node and cause data
loss.
Turn the server node on when the temperature is in its operating
environment range (10°C ... +40°C). For details on the operating
environment, refer to "Safety Precautions". When operating the
device outside of this operating environment, the server node may
operate improperly, damage data etc. Furthermore, Fujitsu cannot be
held responsible for any related damage, malfunction, or loss of data,
etc.
Be sure to wait for 10 seconds or more after shutdown before turning
the server node on.
After connecting the power cable, press the On/Off button after it
passes for more than 10 seconds.
CX2550/60/70 M4
"Troubleshooting and tips" on page
Operating Manual
Starting up and operation
67).
59

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Primergy cx2560 m4Primergy cx2570 m4

Table of Contents