SECONDARY SHEAVE
:
A
64 Nm (6.4 mSkg, 46 ftSlb)
Order
Job name/Part name
Secondary sheave removal
1
V-belt
2
Washer
3
Shim
4
Collar
5
Secondary sheave assembly
SECONDARY SHEAVE
Q'ty
Remove the parts in the order listed below.
1
1
–
Refer to "SHEAVE DISTANCE AND
OFFSET ADJUSTMENT" in CHAPTER 2.
1
1
For installation, reverse the removal
procedure.
–57–
POWR
TR
Remarks